ಸದಸ್ಯ:Demopan444/sandbox

ವಿಕಿಪೀಡಿಯದಿಂದ, ಇದು ಮುಕ್ತ ಹಾಗೂ ಸ್ವತಂತ್ರ ವಿಶ್ವಕೋಶ

Demopan444/sandbox
ಚಿತ್ರ:Namma metro Logo.svg
Info
OwnerBengaluru Metro Rail Corporation Limited (BMRCL)
LocaleBengaluru
Transit typeRapid transit
Number of lines2 (Fully operational)
3 (Under construction)
3 (Under Planning)
Number of stations63[೧]
Annual ridership1 million (2020)[೨]ಟೆಂಪ್ಲೇಟು:Fv
Chief executiveAnjum Parvez (MD)
HeadquartersBMTC Complex, Kengal Hanumanthaiah Road, Shanthinagara, Bengaluru
Websitebmrc.co.in
Operation
Began operation20 ಅಕ್ಟೋಬರ್ 2011 (2011-10-20)
Train length6 coaches[೩]
Headway2–15 minutes[೪]
Technical
System lengthOperational 69.9 km (43.4 mi)

Under Construction (Phase 2,2A & 2B) 103.3 km (64.2 mi) Approved (Phase 3A) 44.65 km (27.74 mi)

Proposed (Phase 3B) 100 km (62 mi)
Track gauge೧,೪೩೫ mm (4 ft 8 12 in) standard gauge
Electrificationಟೆಂಪ್ಲೇಟು:750 V DC
Average speed80 km/h (50 mph)
Top speed120 km/h (75 mph)
Namma Metro Rail Network (as of Dec 2021)

Namma Metro map (As of Dec '21)

Namma Metro ("Our Metro" in Kannada), also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, India.[೫] It is the second longest operational metro network in India after Delhi Metro.[೬][೭] Upon its inauguration, it became the first underground metro system in South India.[೮] Namma Metro has a mix of underground, at grade, and elevated stations. Out of the operational 64 metro stations of Namma Metro as of March 2023, there are 55 elevated stations, 8 underground stations and 1 at-grade station. The system runs on standard-gauge tracks.

Bengaluru Metro Rail Corporation Limited (BMRCL), a joint venture of Government of India and the State Government of Karnataka, is the agency for building, operating and expanding the Namma Metro network.[೯] Services operate daily between 05:00 and 24:00 running with a headway varying between 2–15 minutes.[೧೦] The trains initially began with three coaches but were later converted to six coaches as ridership grew.[೧೧] Power is supplied by 750 kilo volt direct current through third rail. As of January 2020, the metro system had an average daily ridership of about 1,000,000 passengers.[೯]

Map of Namma-metro with phase 3 expansions overlaid with the proposed Bangalore Commuter Rail

History[ಬದಲಾಯಿಸಿ]

The State Town Planning Department had recommended looking into a mass rapid transit project, i.e. a metro for Bangalore city way back in 1977. A high-level Committee had also agreed that a metro study was warranted and a team from Southern Railway (SR) was commissioned to do this in 1981. The Southern Railway team recommended a 2-corridor metro, 80 km (50 mi) in length in addition to commuter rail lines and a ring railway.[೧೨]

In 1993, the State of Karnataka established another committee to look into mass rapid transit. This committee had again recommended the same metro project put forward by SR in 1983 and the same circular railway.[೧೨]

The state created Bangalore Mass Rapid Transit Ltd (BMRTL) in 1994, with terms of reference to seek a public/private partnership for a mass rapid transit project. The government immediately introduced a special city cess dedicated to the anticipated mass rapid transit project. BMRTL commissioned a feasibility study which came up with an elevated, LRT-based, 300 km (190 mi) long network on 6 routes. A private consortium led by United Breweries Group undertook further development of the project on BOT basis. However, the project hadn't taken off.[೧೨]

In 2003, the Government of Karnataka commissioned the Delhi Metro Rail Corporation (DMRC), which had successfully developed the Delhi Metro, to carry out a detailed preparation study for a metro in Bangalore, to be done emulating the technical and financial aspects of the approach used in Delhi. The study recommended a 2-line metro, 60 km (37.3 mi) and 50 km (31 mi) in length, cross shaped. The middle of the cross was to be at the Central Railway Station in Bangalore, completely underground. The economic rate-of-return was forecast at 22.3%. The financial forecast assumes a government subsidy for interest payments and some depreciation, i.e. fare revenue will cover somewhat more than direct operating costs. The Government accepted this option. BMRTL ceased to exist and was replaced by Bangalore Metro Rail Corporation Ltd (BMRCL).[೧೨]

Network[ಬದಲಾಯಿಸಿ]

Namma Metro lines[ಬದಲಾಯಿಸಿ]

Purple Line[ಬದಲಾಯಿಸಿ]

Purple Line is aligned east to west and connects Baiyappanahalli in the east with Kengeri in the southwest. The line is 25.7 km (16.0 mi) long and has 22 stations. It is elevated on both east and west sides and has a 4.8 km (3.0 mi) underground section in the middle. The Line passes through prime activity centers of the city (MG Road, Majestic, Railway Station, Vidhana Soudha etc.). It is currently being expanded under Phase-2.

The first 6.7-kilometre (4.2 mi), 6-station stretch (Reach 1) of the Purple Line between Baiyappanahalli in the east and Mahatma Gandhi Road opened on 20 October 2011.[೧೩] This was the inaugural section of Namma Metro.[೧೪] The second 6.4-kilometre (4.0 mi), 6-station stretch (Reach 2) between Mysore Road and Magadi Road opened on 16 November 2015.[೧೫] The underground section, a 4.8 km (3.0 mi) stretch from Cubbon Park to Bengaluru City (KSR) Railway Station opened on 29 April 2016, thus linking east and west sections that were already opened. Opening the underground section completed the entire Purple Line in Phase-1. A 7.5 km (4.7 mi) extension on the south west opened on 30 August 2021 under phase-2. The eastern extension of 13.4 km (8.3 mi) to Whitefield ( byappanhalli to KR pura is expected to complete in june 2023) opend on 26th March 2023.

Green Line[ಬದಲಾಯಿಸಿ]

The Green Line is aligned north to south and connects Nagasandra in the north-west to Silk Institute in the south-west, covering a distance of 30.4 kilometres (18.9 mi)[೧೬] and has 30 stations.[೧೭] It is elevated on both north and south sides and has a 4.0 km (2.5 mi) underground section in the middle. The Line passes through industrial areas (Peenya, Yeshwanthapur) in the north and also through commercial hubs (Majestic, Chikpete, City Market) and connects large residential catchments in the south (Basavanagudi, Jayanagar, Banashankari etc.). It is currently being expanded under Phase-2.

The first 9.9-kilometre (6.2 mi), 10-station stretch (Reach 3/3A) of the Green Line opened 1 March 2014.[೧೮][೧೯] The stretch connected Sampige Road to Peenya Industry.[೨೦] The second 2.5-kilometre (1.6 mi), 3-station stretch (Reach 3B) of the Green Line from Peenya Industry to Nagasandra, opened on 1 May 2015.[೨೧][೨೨] The third stretch connecting Sampige Road to Yelachenahalli was inaugurated on 17 June 2017 and opened the next day, thereby completing the entire Phase 1.[೨೩][೨೪] These stretches (including the underground section) were inaugurated by then President late Shri Pranab Mukherjee on 17 March 2017.[೨೫][೨೬] The 6.29-kilometre (3.91 mi) stretch from Yelachenahalli to Silk Institute was inaugurated on 14 January 2021, making it the first section of Phase-2 to be opened for service.[೨೭] The northern extension of 3.8 km (2.4 mi) to Madavara is due to open in mid-2023.

Section details and opening dates

Section Phase Length (km)[೨೮] Terminal stations Opening date
Reach 1 (east) 1 6.7 Baiyappanahalli M G Road 20 October 2011
Reach 2 (west) 1 6.4 Mysuru Road Magadi Road 16 Nov 2015[೧೫][೨೯]
Underground UG1 (east–west) 1 4.8 Mahatma Gandhi Road Magadi Road 30 April 2016
Reach 2A/B (west) 2 7.5 Mysuru Road Kengeri 30 August 2021
Reach 1A (east) 2 13.7 Krishnarajapura (K.R.Pura) Whitefield (Kadugodi) 26 March 2023
Reach 3 (north) 1 5.1 Sampige Road Yeshwanthpura 1 March 2014[೧೯]
Reach 3A (north) 1 4.8 Yeshwanthpura Peenya Industry 1 March 2014[೧೯]
Reach 3B (north) 1 2.5 Peenya Industry Nagasandra 1 May 2015[೨೧][೨೨]
Underground UG2 (north–south) 1 4.0 Sampige Road National College 18 June 2017[೩೦]
Reach 4/4A (south) 1 6.4 National College Yelachenahalli 18 June 2017[೩೦]
Reach 4B (South) 2 6.3 Yelachenahalli Silk Institute 15 January 2021[೩೧]

Operational Lines

Line Opening date Last extension Stations[೧೭] Length[೨೮](km) Terminals Rolling stock Track gauge (mm) Power Minimum headway
Purple 20 Oct 2011 26 March 2023 35 39.44 Kengeri Baiyappanahalli BEML 1435mm DC750V 5
Krishnarajapura (K.R.Pura) Whitefield (Kadugodi)
Green 1 Mar 2014 15 Jan 2021 28 40 Nagasandra Silk Institute BEML 1435mm DC750V 5
Total 65[b] 80

[b] Discrepancies in total number of stations is due to an interchange station that is counted once for each line.

Lines Under Construction in Phase 2

More lines and extensions are under construction. When completed, the 2nd phase (currently underway) will provide connectivity to the city's tech hubs of Electronic City and Whitefield, besides covering the eastern half of Outer Ring Road (ORR) and providing service to the Kempegowda International Airport in the north of the city.[೩೨][೩೩]

Lines Under Construction (Phase 2)
Line Estd. Opening Stations Length Terminals Rolling Stock Track Gauge Power
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color; text-align: center" |Purple June-2023 1 1.79 Baiyappanahalli Krishnarajapura (K.R.Pura) BEML, CRRC -Titagarh Wagons 1435mm DC750V
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color; text-align: center" |Green Aug-2023 3 3.77 Nagasandra Madavara BEML, CRRC -Titagarh Wagons 1435mm DC750V
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color; text-align: center" |Yellow Sept-2023 20 25 Rashtreeya Vidyalaya Road Bommasandra BEML, CRRC -Titagarh Wagons 1435mm DC750V
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color; text-align: center" |Pink Mar-2025 20 25 Kalena Agrahara Nagawara TBC 1435mm DC750V
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color; text-align: center" |Blue Est 2025 40 80 Ctrl Silk Board KIA Airport TBC 1435mm DC750V
Total 110 (TBC) 185 (TBC)
Evolution of Namma Metro

Yellow Line[ಬದಲಾಯಿಸಿ]

The Yellow Line connects Rashtreeya Vidyalaya Road to Bommasandra, covering a distance of 18.82-kilometre (11.69 mi) and has 16 stations. This line is completely elevated and runs along ORR and Hosur road. It will begin at an interchange station (Rashtreeya Vidyalaya Road) and pass through two other interchange stations: Jayadeva hospital station, which will be an interchange station with the Pink Line; and Central Silk Board station, a planned interchange station with the Blue Line. Thus, the line connects Electronic City and Bommasandra industrial area with the metro network. The line is scheduled to become operational around December 2023.

On 9 June 2022, Karnataka Government okayed preparation of DPR by Tamil Nadu government for an extension of the Yellow line from Bommasandra to Hosur in Tamil Nadu.[೩೪]

Pink Line[ಬದಲಾಯಿಸಿ]

The Pink Line is aligned from south to north and connects Kalena Agrahara in the south with Nagawara in the north, covering a distance of 21.25-kilometre (13.20 mi) and having 18 stations. It is elevated on the southern side till Tavarakere, the rest is underground till the northern end at Nagawara station. The line will pass through Jayadeva station (interchange with Yellow Line) and Mahatma Gandhi Road (interchange with Purple Line). it passes through Cantonment and ends at Nagawara, which is planned as an interchange station with the Blue Line. The line is under construction and is expected to open in 2025–26.

Blue Line[ಬದಲಾಯಿಸಿ]

This Blue Line is aligned along the eastern and northern sections of ORR. It deviates from ORR at Hebbal and proceeds along Airport road to Kempegowda International Airport. Construction is being handled in two sections: Phase-2A covers Central Silk Board to Krishnarajapuram and Phase-2B covers Krishnarajapuram to Airport. The line will totally be 58.19-kilometre (36.16 mi) long and have 30 stations. It is elevated almost throughout with a small underground section in way of Yelahanka Airforce base. The line also has a section at grade level closer to the airport. Airport station will be an underground station. This line begins at Central Silk Board (interchange with Yellow line), and passes through Krishnarajapuram (interchange station with Purple Line) and Nagawara (interchange station with Pink line). It also passes through Hebbal and Yelahanka. The under construction line is expected to open in 2026. In June 2022, BMRCL launched the first ever U Girder span on ORR-Airport metro line.[೩೫][೩೬][೩೭]

Construction[ಬದಲಾಯಿಸಿ]

Phase 1[ಬದಲಾಯಿಸಿ]

Dr. B. R. Ambedkar metro station, Vidhana Soudha

Delhi Metro Rail Corporation Limited (DMRC) prepared and submitted the detailed project for the first phase of Namma Metro in May 2003. The DPR was for a 33 km (21 mi) network with 32 stations for Phase 1 of the project, using standard gauge. The project was approved by the Union Cabinet on 25 April 2006. The foundation stone for construction of Phase 1 was laid by then Prime Minister Dr. Manmohan Singh on 24 June 2006.[೩೮] Navayuga Engineering Company Limited was awarded the first contract to construct Reach 1 of the east–west corridor in 2006. Civil construction on the first section (Reach-1) of the Purple Line between Baiyyappanahalli and Mahatma Gandhi Road, commenced on 15 April 2007.[೩೯]

DPRs for a northern extension (from Yeshwanthapura to Nagasandra) and a southern extension (from Rashtreeya Vidyalaya Road to Yelachenahalli) was submitted in October 2007 and June 2008 respectively. With these extensions, the total route length for phase-1 became 42.3 km (26.3 mi). The objective was to connect the metro to the Outer Ring Road at northern and southern ends, and also cover the industrial areas of Peenya in the north-west, thereby providing better connectivity and increasing ridership. In October 2008, the Government of Karnataka approved this extension, which would cost an additional ₹1,763 crore (US$250 million).[೪೦]

Underground section[ಬದಲಾಯಿಸಿ]

Both lines in Phase-1 have tunnel sections in the city center which were the first metro tunnels built in South India.[೮] Construction of underground sections in Phase 1 commenced during late 2012. The delay was due to cancellation of the initial tenders called during early 2008 as the entire DPR had to be revised and bids received were too high.[೪೧] A second round of tendering was done in late 2009 with the gigantic Majestic inter-change station as a separate package.[೪೨] Bids were awarded for the tunnel sections during 2011 and construction began in 2012.

The tunnels bored with tunnel boring machines (TBMs), located approximately 60 feet (18 m) below ground level, have a diameter of 5.5 metres (18 ft 1 in) and are 5 metres (16 ft 5 in) apart. The TBMs were nicknamed Helen, Margarita,[೪೩] Kaveri, Krishna and Godavari.[೪೪]

Tunnel boring of underground section UG1 (on east–west corridor) was completed on 17 March 2014.[೪೫] Track works and 3rd rail electrification works were completed on the 4.8 km (3.0 mi) east–west tunnel of the Purple line between Cubbon Park and Magadi Road and Bangalore Metro Rail Corporation Ltd (BMRCL) began trials on 23 November 2015. The entire stretch of the Purple Line was opened on 29 April 2016.[೪೬]

Tunnel boring of underground section UG2 (on north–south corridor) was completed on 23 September 2016. The tunneling faced a major delay when the cutter head of TBM Godavari was broken and spares had to be awaited.[೪೭] Trial runs on the 4.0 km (2.5 mi) east–west tunnel of the Green line between Sampige Road and National College were commenced on 31 March 2017. The entire stretch of Green Line was opened on 19 June 2017, thus completing phase-1 of the project.[೪೮]

Namma Metro Green Line Train

Opening[ಬದಲಾಯಿಸಿ]

After missing deadlines, Namma Metro's first section (Reach-1) had finally opened to the public on 20 October 2011.[೪೯][೫೦][೫೧] There was an overwhelming response by the public at commencement of operations. As per BMRCL sources, within the first 3 days of operations 169,019 people rode the metro.[೫೨] At the end of the 4th day, about 200,000 passengers had already commuted on Namma Metro. Namma Metro's first 12-day cumulative revenue was ₹1 crore (US$100,000).[೫೩]

The northern section of Green Line (Reach 3,3A,3B) was initially scheduled to be opened by the end of 2012. However, it was delayed and finally opened on 1 March 2014.[೫೪] BMRCL MD Pradeep Singh Kharola stated that about 25,000 passengers travelled on the line on the opening day.[೧೯] In the first month of operations, 7.62 lakh people used the line, at an average of 24,605 daily, generating revenues of ₹1.5 crore (US$210,000).

The first underground section (on the Purple line) commenced operations on 30 April 2016, thus providing through connectivity between east and west of the city.

The second underground section, along with southern reaches (viz. Reach 4,4A) was opened on 18 June 2017.[೫೫]

Once the east and west reaches were inter-connected with opening of the underground section of the purple line, ridership surged hugely. After the north–south underground section was opened (simultaneously with the elevated reach 4,4A in the south), the network provided connectivity in all four directions with interchange between the lines and this further increased ridership. Ridership kept increasing and was around 4,50,000 daily (September 2019).[೫೬]

Phase 1 lines and sections[ಬದಲಾಯಿಸಿ]

Namma Metro Purple Line Train

Phase 1 comprises two lines spanning a length of 42.30 kilometres (26.28 mi), of which about 8.82 kilometres (5.48 mi) is underground and about 33.48 kilometres (20.80 mi) is elevated.[೧೬] There are 40 stations in Phase 1, of which 7 stations are underground, 1 at grade and 32 are elevated.[೫೭]

The first phase of the project was initially budgeted at ₹6,395 crore (US$875 million).[೫೮] With route extensions and cost escalation, this was later revised to ₹11,609 crores (US$1.6 billion). There were many delays during construction and as a result, there were several postponements. The difficult geological conditions below ground with a mix of soft soil, high groundwater levels, hard granite and large boulders was a major impediment for tunnel boring. A major delay was due to a broken cutter head of TBM Godavari for which spares had to be ordered from Italy.[೫೯][೬೦] Phase 1, containing 2 lines aggregating 42.3 km (26.3 mi) was completed and services opened to public on 19-June-2017. The final costs for phase-1 were ₹14,405 crores.[೬೧]

Phase 2[ಬದಲಾಯಿಸಿ]

The State Government accorded approval for preparation of the detailed project report (DPR) for Phase 2 by DMRC on 4 January 2011.[೬೨] The high power committee (HPC) gave in-principle clearance to proceed with Phase 2 in July 2011. Karnataka government gave in-principle approval to Phase 2 of the Namma Metro project on 3 January 2012.[೬೩][೬೪] However, there were delays in DPR preparation and hence approval from Central government.[೪೧] Phase 2 was cleared by the expenditure finance committee (EFC) in August 2013. The Union Cabinet finally announced that it had approved plans for phase-2 on 30 January 2014.[೬೫]

The estimated total cost for Phase 2 was around ₹26,405 crore (US$3.7 billion) at 2011-12 price levels.[೬೬] The State Government would contribute ₹9,000 crore (US$1.3 billion).[೬೭] The project cost of ₹26,405 at 2011–12 price levels is set to escalate about 5 per cent every year with increasing cost of inputs. The Union government will share that part of cost escalation due to increase in central levies, while the State and BMRCL will have to bear any other escalation. The total project cost for Phase 2 is estimated to reach at least ₹30,000 crore (US$4.2 billion) at start of construction itself. In October 2018, Deputy Chief Minister G Parameshwara stated that the cost of Phase 2 would be around ₹32,000 crore (US$4.5 billion).[೬೮]

Phase 2 spans a length of 72.095–13.79 km (44.798–8.569 mi) underground, 0.48 km (0.30 mi) at grade and 57.825 km (35.931 mi) elevated, and adds 62 stations to the network, of which 12 are underground.[೬೯] Phase 2 includes extension of the two Phase 1 lines in both directions, as well as construction of two new lines.[೭೦]

The south-end of the Green Line will be extended from Yelachenahalli to Silk Institute (previously named Anjanapura) along Kanakapura Road, north-end from Nagasandra to Madavara (previously named BIEC) on Tumkur Road (NH-4). The east-end of the Purple Line will be extended from Baiyappanahalli to Whitefield and the west-end from Mysore Road to Kengeri (later extended to Challaghatta). A new, 18.82 km (11.69 mi) long, fully elevated line from RV Road to Bommasandra will be constructed, passing through Electronic City. The second new line will be 21.25 km (13.20 mi) from Kalena Agrahara (previously Gottigere) to Nagawara. The line is mostly underground (13.79 km or 8.57 mi), but also has a 6.98 km (4.34 mi) elevated section and a 0.48 km (0.30 mi) at-grade section. There are 18 stations on the line, of which 12 are underground and 6 are elevated.[೫೭] Unlike Phase 1, all stations being built in Phase 2 will have bus bays and/or parking facilities.[೭೧]

Karnataka Industrial Areas Development Board (KIADB) is responsible for acquiring land for Phase 2. It was estimated that 102.02 hectares (252.1 acres) of land would be required for Phase 2 (including Phase 2A). By April 2017, BMRCL had already spent ₹5000 crore on land acquisition.[೭೨]

Construction work began on the south extension of the Green Line from Yelachenahalli to Silk Institute (6.29 km or 3.91 mi) and the west extension of the Purple Line from Mysore Road to Kengeri (8.81 km or 5.47 mi) by October 2016. Construction work on the west extension of Purple Line was awarded in two packages for ₹660 crore,[೭೩] while the Green Line south extension was awarded in a single package for ₹508.86 crore.[೭೪]ಟೆಂಪ್ಲೇಟು:Primary source inline

Construction work for the north extension of the Green Line (from Nagasandra to Madavara) and the east extension of the Purple Line (from Baiyyappanahalli to Whitefield) began in July 2017. The 3.031 km (1.883 mi) north extension is estimated to cost ₹247.41 crore[೭೫] while the east extension (15.5 km) was awarded for ₹1,300 crore (US$180 million).[೭೬]

Construction of the yellow line, a new line from Rashtreeya Vidyalaya Road to Bommasandra in 3 packages began post awarding of tenders in November 2017. The first package (6.418 km / 3.988 mi) was a stretch from Bommasandra to Hosa Road station, including depot entry line to Hebbagodi depot and five Metro stations. The second package was for a 6.38 km (3.96 mi) stretch from Hosa Road to Bommanahalli (previously HSR Layout). Both packages were awarded for ₹1,750 crore (US$250 million) to Thailand-based ITD Cementation India.[೭೬] The third package was for a stretch from RV Road to Bommanahalli (previously HSR Layout), 6.34 km long elevated section and 5 stations, for ₹797.29 crores (US$110 million) and includes the construction of a road-cum-rail flyover, road widening and allied works.[೭೭]

Construction of the 7.5 km elevated section of a new pink line between Kalena Agrahara and Tavarekere (previously Swagat Road Cross) stations, estimated to cost ₹575.52 crore (US$81 million) began post tendering in February 2018. The tender includes the construction of the elevated viaduct, 5 stations and car depot line to Kothanur depot.[೭೮]

Underground section[ಬದಲಾಯಿಸಿ]

BMRC initially floated tenders for the construction of the 13.9 km underground section in four packages during June 2017. However, the tenders were cancelled as all the bids received were far too high (higher by nearly 70%)[೭೯][೮೦] at Rs.8553.45 core (US$1.28 billion) when compared to BMRC's estimated total of Rs 5047.56 core (about US$760 million).

The second round of tendering resulted in tenders being awarded to three firms during March–June period, 2019. One of the firms (L&T) won two bids.[೮೧]

The total awarded tunneling tenders for the underground sections was ₹5,925.95 crores (appx US$812 million).[೮೨][೮೩][೮೪]

Pre-tunneling construction work and piling for stations began in May 2019 by L&T.[೮೫] Tunnel boring using TBMs began in July 2020 by L&T.[೮೬] Tunnel boring work by the other two contractors (viz. Afcons & ITD-Cem) was commenced during 2021.

Phase 2A[ಬದಲಾಯಿಸಿ]

In September 2016, then-Chief Minister of Karnataka Siddaramaiah announced that a new 18 km (11 mi) line connecting Silk Board with K.R.Puram would be included in Phase 2 as Phase-2A of the project. The line would be along the eastern half of Outer Ring Road and is proposed to have 13 stations – Silk Board, HSR Layout, Agara, Ibbalur, Bellandur, Kadubeesanahalli, Kodibisanahalli, Marathahalli, ISRO, Doddanekundi, DRDO Sports Complex, Sarasvathi Nagara (previously Mahadevapura) and K.R. Puram.[೮೭] The cost was estimated to be ₹4202 crores. BMRCL prepared the detailed project report for the proposed line and submitted the DPR to the state government on 28 October 2016.[೮೮] Phase 2A was approved by the State Cabinet on 1 March 2017.[೮೯] The ORR Metro line (Blue line) will have interchange stations with the extended Purple Line at K.R.Puram and with the proposed R V Road – Bommasandra line (Yellow Line) at Silk Board.

Tenders for ORR Metro line (east) were called during February 2018 and IL&FS emerged the lowest bidder for all packages. However, the tenders were quashed due to cash flow problems and bankruptcy proceedings by the firm.[೯೦] A second round of tendering was done during December 2019 and bids were received by multiple firms during March 2020.[೯೧][೯೨] There are two packages. The first package included 2.84 km of ramps for a flyover at Central Silk board junction in addition to 9.859 km of viaduct with six elevated stations. The second package was for 8.377 km viaduct with seven elevated stations, 1.097 km depot line and a 0.30 km pocket track.

Phase 2B[ಬದಲಾಯಿಸಿ]

There had been a proposal to build a 33 km (21 mi) high speed rail line from MG Road to Kempegowda International Airport (KIA), at a cost of ₹5,767 crore (US$810 million).[೯೩] This was to be executed by an independent SPV, but later it was decided that BMRC would manage this project and a regular metro line with fewer halts would be built instead of a high speed rail, thus travel time between city to airport would be less. As early as in February 2012, the Central Government had also requested BMRC to start work on the airport link during Phase 2 itself.[೯೪][೯೫]

Following this, during September 2016, suggestions were invited from public to choose any one of nine possible extension routes from existing and proposed metro lines to the airport.[೯೬] The proposed extension routes had an average length of 30 km (19 mi), and cost estimates ranged between ₹4,500 crore and ₹7,000 crore. A 25.9 km (16.1 mi) extension from Nagawara via Kannur and Bagaluru was the shortest, while the 35.4 km (22.0 mi) extension from Yeshwanthpur via Yelahanka, Kannur and Bagaluru was the longest of the proposed routes. BMRC received 1,300 responses from the public.[೯೭] A 25.9 km (16.1 mi) extension of the Kalena Agrahara (previously Gottigere) – Nagawara line via Kannur and Bagaluru to the airport emerged as the most popular choice.[೯೮]

Since Bangalore International Airport Limited (BIAL) forbade underground construction from the southern side of the airport (due to security as it would have to pass beneath the airport's second runway), the shortest route options (i.e. extending the Pink line from Nagawara directly north) were eliminated. An alternate route proceeding north till RK Hegde nagar and then turning west to Jakkur was then explored. However, even this had an obstacle as a high-pressure petroleum pipeline was passing through the originally proposed route.[೯೯]

Bangalore Development Minister K. J. George announced on 12 May 2017 that the government had finalized the Nagawara-Ramakrishna Hegde Nagar-Jakkur-Yelahanka route to the airport.[೧೦೦] On 10 January 2019, the State Cabinet approved a change in alignment for the proposed metro line to the airport. The new line would begin at Krishnarajapura (K.R. Puram) and be aligned along the northern part of ORR (Outer Ring Road), passing Nagawara, Hebbal, and Jakkur before heading towards the airport along Ballari road.[೧೦೧] The line would be 39.8 km (24.7 mi) long, about 8 km (5.0 mi) longer than the route previously proposed. It is estimated to cost ₹10,584 crore (US$1.5 billion) almost twice as much as the previous route's estimate of ₹5,950 crore (US$830 million).[೧೦೨]

The Union Cabinet cleared two much awaited lines of the Bengaluru Metro's Phase-2A and 2B on 20 April 2021. Phase-2A and Phase 2B lines total a distance of 58.19 km and were approved at a cost of Rs.14,788 crore. The projected ridership on both these lines in 2026 is estimated at 7.7 lakhs.[೧೦೩] Construction of the airport line is expected to begin by October 2021.[೧೦೪] In January 2023, there was an accident when an reinforcement cage of the under-construction metro pier fell on a woman software engineer, Tejaswini Sulakhe and her son Vihan in HBR Layout,[೧೦೫][೧೦೬] which led to their eventual death.[೧೦೭][೧೦೮] BMRCL announced a financial assistance of 20 lakh.[೧೦೯][೧೧೦] Chief Minister Basavaraj Bommai also announced a separate compensation of Rs 10 lakh for each of the deaths from the Chief Ministers’ Relief Fund.[೧೧೧][೧೧೨]

Phase 2, 2A, and 2B lines and sections[ಬದಲಾಯಿಸಿ]

Phase 2 originally involved extending four reaches of the two lines in all directions and two new lines (Yellow Line and Pink Line).

The ORR-East Line was later included as Phase 2A followed by the Airport Line (as a continuation of the ORR-East Line) as Phase-2B. The line was later named as Blue Line.

Construction of Phase 2 has been divided into six (elevated) reach extensions and four underground sections. Construction of Phase 2A has been divided into two (elevated section) packages. Construction of Phase 2B has been divided into three (elevated section) packages. Airport stations have not been included with tenders as they will likely be built by Kempegowda International Airport.

Progress on Construction[ಬದಲಾಯಿಸಿ]

Line Terminals Length New stations [೧೧೩][೧೧೪] Expected Work Completion date
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;" |Purple Line Kengeri ↔ Challaghatta 1.3 km 1 September 2023[೧೧೫]
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;" |Purple Line Baiyyappanahalliಟೆಂಪ್ಲೇಟು:Stl 1.79 km 1 June 2023[೧೧೬]
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;" |Green Line Nagasandra ↔ Madavara 3.77 km 3 September 2023
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;" |Yellow Line Rashtreeya Vidyalaya Road ↔ Bommasandra 19.1 km 16 March 2024
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;" |Pink Line Kalena Agrahara ↔ Nagawara 21.1 km 17 December 2025
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;" |Blue Line Central Silk Board ↔ KR Puram 18.3 km 13 December 2024
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;" |Blue Line KR Puram ↔ Kempegowda International Airport 37.7 km 17* December 2024
Total (Phase-2, 2A, 2B) : 104.3 km 69 *Includes two Airport Stations

List of contracts for various sections under construction is as per table below:

ಚಿತ್ರ:NammaMetro-Ph-2 Status.jpg

Finances[ಬದಲಾಯಿಸಿ]

Funding[ಬದಲಾಯಿಸಿ]

Phase 1[ಬದಲಾಯಿಸಿ]

Baiyappanahalli Stn (Street Level)

Phase 1 missed nine deadlines, and its cost was revised four times. The initial cost estimate for Phase 1 when it had been approved in 2006 was ೬,೩೯೫ ಕೋಟಿ (ಯುಎಸ್$೧.೪೨ ಶತಕೋಟಿ). The increase in length from 33 to 42.3 km (20.5 to 26.3 mi) increased the total cost to ೮,೧೫೮ ಕೋಟಿ (ಯುಎಸ್$೧.೮೧ ಶತಕೋಟಿ). Delays caused further escalations. The cost escalated to ೧೧,೬೦೯ ಕೋಟಿ (ಯುಎಸ್$೨.೫೮ ಶತಕೋಟಿ) in 2011 and ೧೩,೮೪೫ ಕೋಟಿ (ಯುಎಸ್$೩.೦೭ ಶತಕೋಟಿ) in 2015. The final cost to build Phase 1 was estimated at ೧೪,೪೦೫.೦೧ ಕೋಟಿ (ಯುಎಸ್$೩.೨ ಶತಕೋಟಿ).[೧೧೭] Land acquisition for Phase 1 accounted for ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks.[೧೧೮]

The Central and State Government funded 58.91% of the cost. The remaining 41.09% was secured through loans from domestic and foreign financial institutions.[೧೧೭] BMRCL secured ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks through long-term loans and ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks by selling bonds, while the remaining cost was funded by Central Government and the State Government. BMRCL secured loans from several agencies – ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks from the Japan International Cooperation Agency (JICA), ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks from the Housing and Urban Development Corporation Limited (HUDCO), ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks from the Asian Development Bank (ADB), and the rest from the French Development Agency. Approximately 10% of the 6500 crore had to be paid as interest by the BMRCL each year. The Federation of Karnataka Chambers of Commerce and Industry (FKCCI) estimated that this amounted to an interest payment of ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks per day. BMRCL stated that interest component wasn't that high but it was "definitely more than ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks per day".[೧೧೮]

Namma Metro elevated section

BMRCL announced plans on 13 June 2013 to issue 10-year bonds.[೧೧೯] The proposed bonds received a credit rating of "IND AA" from India Ratings & Research (Ind-Ra).[೧೨೦] Namma Metro MD N. Sivasailam announced on 3 August 2013 that the issue of bonds would be postponed as the market was volatile. He stated that the metro would "be in the market soon when it is stable".[೧೨೧]

Phase 2 /2A /2B[ಬದಲಾಯಿಸಿ]

On 3 January 2012, the Karnataka government approved a budget of ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks for Phase 2 of Namma Metro project.[೧೨೨] Phase 2 is estimated to cost ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks. Land acquisition is expected to account for ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks.[೧೧೮] The Central and State Governments will fund around 15,000 crore.[೧೨೩] The State and Central Governments will bear 30% and 20% of the project cost respectively. The remaining will be obtained through senior term loans.[೧೨೪] BMRCL is permitted to raise up to 9,000 crore through loans.[೧೨೩]

On 27 March 2012, Asian Development Bank (ADB) signed an agreement to lend $250 million to BMRC to part-finance Phase 2. The loan marked the multilateral lending agency's foray into the urban transport sector in South Asia, the ADB said in a press release. The loan, approved by the ADB Board in March 2011, is the first ADB loan to the urban transport sector without recourse to sovereign guarantees.[೧೨೫] In 2016, the Agence Francaise De Development (AFD) sanctioned a 1,600 crore loan for the project. The rate of interest on the loan is linked to Euro Interbank Offered Rate (Euribor) + 130 basis points. In early 2017, the European Investment Bank agreed to loan 3,700 crore to BMRCL, with a repayment period of 20 years at a rate of interest lower than the one on the AFD loan.[೧೨೩][೧೨೬]

In May 2017, BMRC received in-principle approval from the European Investment Bank (EIB) to fund construction of the Gottigere-Nagawara line through a 3700 crore loan.[೧೨೭] The line is being co-financed by the Asian Infrastructure Investment Bank and the Central and State Governments.[೧೨೮]

Indian firms Biocon and Infosys announced that they would provide funding for the construction of the Hebbagodi and Electronics City metro stations respectively on the RV Road-Bommasandra Metro line. BMRC expects that each firm will contribute ೧೦೦ ಕೋಟಿ (ಯುಎಸ್$೨೨.೨ ದಶಲಕ್ಷ) towards the project. Biocon CMD Kiran Mazumdar Shaw stated that the company wanted to fund the project because it would help decongest the city. Both Biocon and Infosys have offices located near the stations.[೧೨೯]

BMRCL secured a $318 million loan from JICA in March 2021, and a $500 million loan from the ADB in August 2021 to fund construction of the ORR-Airport metro. The State and Union governments will contribute ೩,೯೭೩ ಕೋಟಿ (ಯುಎಸ್$೮೮೨.೦೧ ದಶಲಕ್ಷ), and the Karnataka Government will pay an additional ೨,೭೬೨ ಕೋಟಿ (ಯುಎಸ್$೬೧೩.೧೬ ದಶಲಕ್ಷ) for land acquisition.[೧೩೦]

Revenues[ಬದಲಾಯಿಸಿ]

During the first month since the opening of Reach I of just 6.7 km, about 13,25,000 people travelled by metro.[೧೩೧] On average, 41,390 people took the train every day, while the average daily revenue was ೬,೬೭,೨೬೨. The BMRC earned a revenue of ೨.೧ ಕೋಟಿ ಯುಎಸ್$೪,೬೬,೨೦೦) in its first month of operation.[೧೩೨] However, during the first six months of operation, average ridership went down to 24,968. The BMRC earned a total of ೬.೬ ಕೋಟಿ (ಯುಎಸ್$೧.೪೭ ದಶಲಕ್ಷ) during the same period.[೧೩೩] Namma Metro posted a profit of 41 ಲಕ್ಷ (ಯುಎಸ್$೯೧,೦೦೦) after about one year of operations of Reach I. BMRCL estimates that nearly 80 lakh passengers travelled on the system in its first year of operations.[೧೩೪] Namma metro is also pursuing selling retail space within the metro stations to generate non-fare revenue.[೧೩೫]

The following table shows annual ridership and farebox revenue of Namma Metro since inception.[೧೩೬][೧೩೭]

Year Passengers Fare Box Revenue()
2011–12 4,166,000 6.17 crore
2012–13 6,636,000 8.70 crore
2013–14 7,255,000 9.86 crore
2014–15 11,400,000 17.83 crore
2015–16 16,800,000 28.29 crore
2016–17 54,225,130 110.09 crore
2017–18 109,206,905 281.00 crore
2018–19 133,738,555 355.02 crore
2019-20 174,219,000 376.88 crore

Infrastructure[ಬದಲಾಯಿಸಿ]

Inside a Metro coach on the day of Inauguration

Rolling stock[ಬದಲಾಯಿಸಿ]

BMRC procured 150 metro coaches for fifty 3-car train sets in DMC-TC-DMC formation for Phase l of Namma Metro from BEML - Hyundai Rotem at a cost of Rs 1,672.50 crore (Rs 16.72 billion). Coach specifications were as follows. Dimensions: Length-20.8m, Width-2.88m, and Height-3.8m. Each coach had a seating capacity of about 50 and standing capacity of 306 (basis 8 per sqm). Thus, each train had a capacity of about 1000. Traction is through four 180 kW motors in each motor coach. The trains have a maximum speed of 80 kmph and axle load of 15 tonnes. The trains operate on 750V DC with third rail bottom power collector system. Features include stainless steel body fully air-conditioned coaches, longitudinal bank of wide seats, wide vestibules between coaches, non-skid and non-slip floor surfaces, wi-fi enabled, four wide passenger access doors on each side, wide windows, automatic voice announcement system and electronic information and destination display system.

Thus, initial operations began with 3-coach trains. Each train had a capacity of 1000 passengers. As loads increased with increasing ridership, all trains were converted to six coaches.

The first train set made a trial run in December 2010.[೧೩೮] In early 2017, BMRC floated tenders for an additional 150 coaches to convert all trains to 6 coach trains on the two Phase 1 routes.[೧೩೯] On 27 March 2017, BEML announced that it had won an 1,421 crore contract to supply the coaches.[೧೪೦] The first six car train was introduced on the Purple Line on 23 June 2018.[೧೪೧] By January 2020, all trains had been converted to six coaches.[೧೪೨]

Free Wi-Fi service was made available to commuters on 31 July 2013.[೧೪೩] Passengers also have emergency voice communication with train staff through a speaker system. Passengers are provided with a call button to communicate with the driver or control center during an emergency.[೧೪೪]

Power supply[ಬದಲಾಯಿಸಿ]

In December 2009, the ABB Group was awarded the contract to provide power solutions for the first phase of the planned metro network. ABB designed, supplied, installed and commissioned four substations that receive and distribute electricity, each rated at 66/33 kV, as well as the auxiliary and traction substations. ABB also provided an integrated network management system, or SCADA (Supervisory Control And Data Acquisition), to monitor and control the installations.[೧೪೫] BMRC currently pays BESCOM 5.7 per unit of electricity.[೧೪೬]

In 2016, BMRCL signed an agreement with CleanMax Solar to set up solar installations at Baiyapanahalli and Peenya stations. After Phase 2 of the metro is complete, CleanMax Solar will set up similar installations at the metro depots in Challaghatta, Whitefield, Kothanur and Hebbagodi. Per the agreement, CleanMax Solar will bear the cost of installation and the BMRC will pay CleanMax a rate of 5.5 per unit of electricity for three years. Following the three-year period, all six installations will be transferred to the BMRC. According to the BMRC director of operations NM Dhoke, "The 1.4 MW installation can generate up to 10,000 units, which help power the depot facilities. However, it is not sufficient to power the trains, but it will help us save 51 crore over 25 years on energy".[೧೪೬]

In February 2019, Alstom was awarded a GBP 62 million contract to provide electrification systems for Phase II of the Namma Metro. The company will construct 56 substations to supply power for Phase II of the system.[೧೪೭]

Signaling[ಬದಲಾಯಿಸಿ]

In September 2009, the consortium led by Alstom Project India Limited was awarded a contract worth ೫೬೩.೪ ಕೋಟಿ (ಯುಎಸ್$೧೨೫.೧ ದಶಲಕ್ಷ) to supply control and signalling system for the first phase of the project. The consortium is led by Alstom and composed of Alstom Transport SA, Thales Group Portugal S A, and Sumitomo Corporation. Alstom will provide the design, manufacture, supply, installing, testing, and commissioning of the train control and signalling system and Thales will provide the design, installing, testing, and commissioning of the telecommunication system for Phase 1 of the metro system. It includes the Urbalis 200 Automatic Train Control system which will ensure optimal safety, flexible operations and heightened passenger comfort.[೧೪೮][೧೪೯]

The integrated control center at Baiyyappanahalli has direct communication with trains and stations are CCTV fitted with visual and audio service information.[೧೪೪] Passengers have emergency voice communication with train staff.

Stations[ಬದಲಾಯಿಸಿ]

There are 51 stations on the Namma Metro network. Majestic station is the largest with a total floor area of 48,000 square metres (520,000 sq ft).[೧೫೦]

Initially, there were no toilets at Namma Metro stations. BMRCL eventually heeded public demand, and the metro's first toilets were opened at Baiyappanahalli and Indiranagar stations on 21 June 2013.[೧೫೧] As of February 2017, there were 33 ATMs at Namma Metro stations.[೧೫೨]

The 12 underground stations built during Phase II will be smaller in size than the underground stations built in Phase I to minimise land acquisition costs.[೧೫೩] All Phase I underground stations were 272 meters long and 24 meters wide, except for Chickpet and K.R. Market stations which had the same width but were 240 meters long. In contrast, Phase II's underground stations are shorter at 210 meters but retain the same width.[೧೫೪]

On 17 February 2017, Uber announced that it would open booking counters at 12 metro stations by the end of March 2017. The counters enable commuters to book an Uber, and is aimed at commuters who do not have access to the internet or do not have the Uber mobile app installed on their phone. Ola Cabs announced a similar arrangement on 22 February 2017.[೧೫೫][೧೫೬]

Depots[ಬದಲಾಯಿಸಿ]

Under phase-1, two depots were built at Baiyyappanahalli and Peenya. For the line extensions in phase-2, BMRC is building additional depots at Anjanapura on the Green Line and at Challaghatta and Kadugodi for the Purple Line. For the new lines in phase-2, depots are being built at Kothanur (Pink Line) and at Hebbagodi (Yellow Line).

For the Blue Line (airport line, phase-2A), the Baiyyappanahalli depot is planned to be used[೧೫೭] as two depots are being built for Purple Line at its ends. In addition, a depot is planned at Doddajala, near the Trumpet inter-change. The depot at Baiyappanahalli has an operations control center for managing the metro network and also a training center.

Depot Line Built Area (Acres) Remarks
Baiyyappanahalli[೧೫೮][೧೫೯] Purple Phase-1 50 Depot-Cum-Workshop; Operation Control Center; Metro Training Center.

Transition planned from DTG to CBTC depot (for Blue line trains)[೧೫೭]

Peenya[೧೬೦][೧೬೧] Green Phase-1 100 Depot-Cum-Workshop
Anjanapura[೧೬೨] Green Phase-2 8.9 Depot, Stabling
Challaghatta[೧೬೨][೧೬೩] Purple Phase-2 47.0 Depot-Cum-Workshop
Hebbagodi[೧೬೨] Yellow Phase-2 39.3 Depot-Cum-Workshop
Kothanur[೧೬೪] Pink Phase-2 31.5 Depot-Cum-Workshop
Kadugodi[೧೬೫] Purple Phase-2 44.75* Depot-Cum-Workshop

*Land includes two stations (Channasandra & Kadugodi)

Shettigere, Doddajala[೧೬೬][೧೬೭] Blue Phase-2B 23.0 In planning stage

Vertical gardens[ಬದಲಾಯಿಸಿ]

The BMRC granted permission to Hydrobloom, a start-up company, to grow hydroponic plants on the pillars of the Namma Metro. Pillars covered with plants are referred to as vertical gardens. Hydrobloom had previously developed a vertical garden on a metro pillar near Rangoli Art Centre next to the MG Road Metro station. The gardens are intended for beautification and to reduce air pollution.[೧೬೮]

Safety[ಬದಲಾಯಿಸಿ]

As of February 2014, BMRCL has two road-cum-rail rescue vehicles that can be used to perform evacuations or re-load derailed trains back onto the track.[೧೬೯]

The trains are equipped with derailment prevention equipment, and the tracks are equipped with concrete barriers to prevent trains from leaving the viaduct. The support pillars are earthquake-proof and are designed to have a lifespan of at least 100 years. Trains are equipped with sensors to detect impending collisions, and have automatic braking systems to prevent speed limits from being exceeded.[೧೭೦] In case of train stoppages midway between stations during emergencies, pavements beside tracks are provided on elevated viaducts as well as in underground sections.

Accessibility[ಬದಲಾಯಿಸಿ]

Yellow tactile tiles are used at all stations to guide the visually impaired. The tiles start at the ramp and lead to the staircases and lifts.[೧೭೧] Disabled and elderly passengers can avail a wheelchair at all metro stations. The wheelchair can be used by the passenger to board a train and then dropped off at the destination station.[೧೪೬] In February 2017, BBMP and BMRC began a project to upgrade all footpaths along metro routes. The project is estimated to cost 40 crore and was scheduled to be completed in 18 months.[೧೭೨][೧೭೩]

Rainwater harvesting[ಬದಲಾಯಿಸಿ]

BMRCL, in a public-private partnership, harvests rainwater from the viaducts on the rail system. The private partner, Karnataka Rural Infrastructure Development (KRIDL), collects the water at multiple points, treats it, and sells it in bulk as potable water.[೧೭೪] Pipes inside each metro viaduct pillar carry the rainwater from the viaduct down to underground tanks located beneath the median. When these tanks overflow, the water is diverted to 5 metres deep rainwater harvesting pits. Two rainwater harvesting pits are installed between each pillar. The average distance between the two pillars is 28 meters. As of March 2017, a 33.48 km (20.80 mi) of the elevated metro is covered by the rainwater harvesting system. With the completion of Phase 2 of the metro, the BMRCL will cover a total of 58 km (36 mi) with rainwater harvesting systems.[೧೭೫] Around 8 crore litres of water are expected to be collected annually.[೧೭೬]

BMRCL also harvests rainwater from the 140 acres depot facility at Peenya. Water will be collected from the ೧,೯೦,೦೦೦ sq foot roof and stored in two tanks with a capacity of 50,000 litres each. Rainwater harvesting is also planned in existing and under-construction stations. The water harvested will be supplied to places where needed, and any excess will be used for groundwater recharge.[೧೭೬]

BMRC has installed a water harvesting system along Reach 1 and will be doing the same for Reaches 3 & 4. Installation of flower beds was delayed due to garbage being dumped on the median by garbage collectors, BMRC will also set up flower beds on Reach 1 with assistance from the horticulture department. However, the work related to this has slowed down due to garbage contractors dumping garbage along the median, due to the lack of a waste management plan in the city.[೧೭೭] BMRC also planned to rejuvenate Kengeri and Veerasandra lakes using water collected from a nearby corridor.[೧೭೮][೧೭೯]

Operations[ಬದಲಾಯಿಸಿ]

Fare collection[ಬದಲಾಯಿಸಿ]

Ticket tokens (front and back view)

MIFARE DESFire platform, developed by NXP Semiconductors, was selected to manage the Automated Fare Collection (AFC) for Namma Metro.[೧೮೦] The system uses contactless smart tokens and contactless smart card.[೧೮೧] Tokens are available only for a single journey.[೫೭] Smart cards can be used for multiple journeys.[೫೭] There is currently one type of smart card available on the metro – Varshik.[೧೮೨]

  • Varshik is priced at 50, with ₹50 as a user deposit. It is valid for a year, and provides a 5% (earlier 15%) discount on fares.[೧೮೩] The card can be recharged.
  • Saral was available for 70. It permitted one day's travel on BMTC non-air-conditioned buses and on the metro. Saral is no longer available.
  • Saraag was available for 110. It permitted one day's travel on BMTC air-conditioned buses and on the metro.[೧೮೪] Saraag is no longer available.
  • Sanchar was available in denominations of 10, 40, 50 and 100. Sanchar was withdrawn from 1 March 2017.[೧೮೫][೧೮೬]
  • National Common Mobility Card(NCMC) can be purchased from Namma metro stations free of charge by surrendering their varshik cards and in RBL Bank branches from March 30. This card can also be used for shopping, fuel, BMTC and KSRTC ticketing and also for travel throughout India.

BMRCL began selling tokens through automatic ticket vending machines (ATVMs) on 4 December 2012 at MG Road, Indiranagar and Baiyyappanahalli stations. The service will eventually be expanded to all metro stations. The touchscreen-enabled ATVMs are available in 3 languages – English, Kannada, and Hindi. Commuters can purchase a single journey token by selecting the destination station or the amount in the ATVM. They can also add value or add trips to the contactless smart card. Commuters can purchase up to 8 tickets at a time and can get the receipt printer for card recharge. ATVMs accept coins of 5 and 10 denominations and 10, 20, 50, 100, 500 denominations of currency notes. However, the ATVM cannot differentiate between 1 and 2 coins.[೧೮೭][೧೮೮]

In November 2016, BMRC began accepting online payments to recharge smart cards. Tickets cannot be purchased online.[೧೮೯] Approximately 68% of passengers on the metro use smart tokens and 32% use smart cards.[೧೩೪]

Metro system in Bengaluru charges full fare tickets for children above 3yrs of age which is against the Indian government circular date 6 March 2020, No. TC-II/2910/2016/child fare/VIP. Circular number 12 states that "Children under five years of age shall be carried free and purchase of any ticket is not required". "In case of children of age 5 years to under 12 years of age (in case of no berth) only half of the applicable fare shall be charged and in this case, a minimum distance of charge shall not be applicable". (CC30 of 2017 dated 24 April 2017). Similarly Karnataka government public transport system does not collect fares from children under the age of 6 yrs and half fares from children under 12 yrs of age. Unfortunately Bengaluru metro decided to include 3 ft as a criterion to decide who is classified as a child. The average height of Indian babies at 3 yrs is much more than 90 cms. Since BMRCL is a joint venture of the Government of India and the Government of Karnataka, it should be expected to follow Government of India/ Karnataka rules.

On 26th March 2023 Prime Minister Narendra Modi symbolically launched long awaited National Common Mobility Card(NCMC) in Bengaluru while he traveled in newly inaugurated Whitefield strech of purple line using NCMC.

Frequency[ಬದಲಾಯಿಸಿ]

The metro service runs between 05:00 and 23:00 hours. The service starts at 07:00 hours on Sundays. There are trains every 8 minutes between 08:00 and 20:00, and every 10 minutes at other times.[೧೯೦] On weekdays, trains operate at 4-minute intervals between 09:00 and 10:00.[೧೯೧] The headway is slated to decrease to once every three minutes after completion of Phase I.[೧೪೬] The end-to-end travel time on the Purple Line is 35 minutes, and on the Green Line 45 minutes.[೧೯೨]

Metro services have occasionally operated beyond 23:00 hours. Services are usually extended on festival days or when an international cricket match is held in the city.[೧೯೩][೧೯೪]

Ridership[ಬದಲಾಯಿಸಿ]

The Purple Line's Reach-1 of 6.7 km was the first to open during October 2011. On the first 3 days of operations of Reach-1, 169,019 people rode the metro.[೫೬] At the end of the 4th day, about 200,000 passengers had already commuted on Namma Metro. During the first month since opening of Reach-1, about 1,325,000 people had travelled by metro. Thus, on average, 41,390 people took the train each day during the first month. However, the average ridership during the first six months of operation dipped down to 24,968.[೧೩೭]

The northern section of Green Line (Reach 3,3A - 9.9 km) opened during March 2014. About 25,000 passengers travelled on the northern section on the opening day.[೨೩] In the first month of operations of the Green Line stretch, 762,000 people used the line, at a daily average of 24,605.

Reach-1, Reach-3/3A and Reach-2 (opened during November 2015) operated independently until the east–west underground section of Purple Line (connecting Reaches 1 and 2) was opened during April 2016. Once the east and west reaches were inter-connected with the intermediate underground section of Purple line, ridership surged hugely to nearly 100,000 a day on the line in the first few days.[೧೯೫] After the north–south underground section was opened (simultaneously with the elevated reaches 4,4A in the south), the network provided connectivity in all four directions with interchange between the lines and this increased ridership further, reaching between 350,000 and 360,000 on average by December 2017.[೧೯೬]

As ridership kept growing, overcrowding became a serious concern. Hence, 3-coach trains were converted to 6 coaches. The first six car train was introduced on the Purple Line on 23 June 2018. By January 2020, all trains had been converted to six coaches.[೧೪೬]

During 2019–20, the annual ridership was 174.22 million (average during the year was thus 477,315). The maximum daily ridership of 601,164 was on 25 October 2019 while the highest daily revenue of Rs.1.67 crore was on 2 March 2020. During January 2020, ridership averaged 518,074.[೯]

Due to Covid pandemic, services were halted from 25 March 2020 onwards. Operations resumed on 7 September 2020.[೧೯೭] During the second wave, operations were again halted from 27 April 2021 to 20 June 2021.[೧೯೮] Services remained limited throughout the pandemic period and ridership was low due to enforcement of constrained capacity and social distancing norms, as stipulated by the state government.

Speed[ಬದಲಾಯಿಸಿ]

The system is designed for a maximum train speed of 80 km/h (50 mph). However, the Research Design and Standards Organization (RDSO) fixed the speed at which trains are allowed to operate commercially as 67.50 km/h (41.94 mph) on straight sections, 35 km/h (22 mph) on curves, and 45 km/h (28 mph) in stations.[೧೯೯]

Security[ಬದಲಾಯಿಸಿ]

The Karnataka State Industrial Security Force (KISF) is responsible for security on the Namma Metro.[೨೦೦] Bangalore Police conducted detailed mock drills at metro stations for the first time on 25 March 2017. Police officials stated that the drill was to assess readiness to deal with situations such as hoax bomb calls, terrorist infiltration, or attacks. Sniffer dogs, bomb detection and disposal squad, anti-sabotage squad, and Quick Reaction Teams (QRTs) were involved in the drill. Police had previously conducted basic mock drills, but this was the first one aimed toward dealing with specific threats. The chosen day was a Saturday, when crowds are usually larger, in order to make the drill more challenging for officers. The BMRCL had not informed of the drill in advance.[೨೦೧]

Laws[ಬದಲಾಯಿಸಿ]

The Bangalore Metro Rail (Carriage and Ticket) Rules 2011 limit the weight of personal baggage to 15 kg. Rule 3 says: "No person shall, while traveling in metro railway, carry with him any goods other than small baggage containing personal belongings not exceeding 60cm x 45cm x 25cm in size and 15kg in weight, except with the prior approval of the metro railway administration." The rules also prohibit carrying explosive, inflammable, and poisonous substances.[೨೦೨]

The Metro Railway (Operations and Maintenance) Act, 2002, imposes fines and in some cases jail sentences for offences committed on the metro.[ಸೂಕ್ತ ಉಲ್ಲೇಖನ ಬೇಕು] Anyone indulging in sabotaging the train or maliciously hurting or attempting to hurt other passengers while travelling in the metro can face imprisonment for up to 10 years. Pasting posters or drawing graffiti on the walls of stations or trains is punishable by a fine of 1,000 or imprisonment for up to 6 months. Traveling in an inebriated state or creating nuisance in the train is punishable by a 500 fine.[೨೦೩] Passengers are monitored at security checkpoints and those that are causing trouble, heavily drunk, or carrying forbidden items are not permitted to board.[೨೦೪] Spitting on the metro premises is punishable by a fine of 100.[೨೦೫]

Mobile app[ಬದಲಾಯಿಸಿ]

The BMRCL launched a Namma Metro app for Android devices in 2013. However, it had limited features.[೨೦೬] The app was officially re-launched on 4 November 2016 with additional features.[೨೦೭] The app was developed by the Centre for Development of Advanced Computing (CDAC). The app allows users to purchase and recharge smart cards, locate nearby metro stations and also provides information related to parking, train frequency, route map, and fare details.[೧೪೬][೨೦೮]

Future expansion[ಬದಲಾಯಿಸಿ]

Proposed routes[ಬದಲಾಯಿಸಿ]

To meet the growing traffic demands, a 124 km (77 mi) Phase 3 was initially proposed in May 2016.[೨೦೯] Certain significant sections that were proposed for Phase 3 were included in Phase 2 as Phase 2A and Phase 2B for 58.19 km.[೨೧೦][೨೧೧][೨೧೨]

In December 2019, BMRCL unveiled a Comprehensive Mobility Plan as tabled below for subsequent phases:[೨೧೩][೨೧೪]

Comprehensive Mobility Plan (2019) Length
JP Nagar - Hebbal Kempapura (Phase 3) 32.15 km
Magadi Road Toll gate - Kadabgere (Phase 3)(Metrolite) 12.5 km
Hebbal - Sarjapura (Phase 3a) 35 km
Whitefield Hope farm - MG Road(Phase 3a) 16 km
Inner Ring UG Metro (Phase 3a) 34 km
Whitefield - Katamanallur (Phase 3b) (Purple line extension) 6 km
Nagawara - Bagalur cross (Phase 3b) (Pink line extension) 12 km
Total 147.65 km
Future Schematic Map of Namma Metro with all Phases up to Phase-3 (including Suburban Rail)

Phase 3[ಬದಲಾಯಿಸಿ]

On 7 March 2020 it was announced that two corridors totaling 44.65 km will be implemented as a fully elevated system.[೨೧೫] under PPP mode with the target to complete the construction within 2027.[೨೧೬][೨೧೭][೨೧೮] On 4 March 2022, during budget speech by the state government, a new corridor spanning 35 km from Hebbal to Sarjapura was announced. The Chief Minister stated that action would be taken to prepare the Detailed Project Report (DPR) for the proposed corridor estimated to cost around ₹15,000 crores. The DPR of the 44.65 km two corridors announced earlier will be submitted to the Central Government for approval. The two corridors Hebbal Kempapura to JP Nagar (along ORR on the west) and Hosahalli to Kadabagere were estimated to cost ₹13,500 crores. Thus Phase 3 will be likely for a total of 80 km.[೨೧೯][೨೨೦]

Livery Line Terminals Length New stations Projected completion
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;" | Orange Line JP Nagar Phase 4Kempapura (Elevated) 32.15 km 22 2028[೨೧೭]
TBD TBD Hosahalli ↔ Kadabagere (Elevated) 12.5 km 9 2028[೨೧೭]
TBD TBD KempapuraSarjapura (17 km UG Hebbal ↔ Koramangala) 35 km 29 2030[೨೧೯][೨೨೧]

Phase 4[ಬದಲಾಯಿಸಿ]

On 10 March 2023, government of Karnataka announced an action plan to make the state one trillion dollar economy which included a proposal for four new metro corridors. The new corridors costing ₹27,000 crores would add 59 kms of length to the system and will lead to the government's target of making metro accessible to every citizen within one to two kilometres by 2032.[೨೨೨]

Livery Line Terminals Length New stations Projected completion
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;"| Purple Line extension WhitefieldHosakote (Elevated) 6 km TBD 2032
style="background:#ಟೆಂಪ್ಲೇಟು:Rail color;"| Pink Line extension Bannerghatta ↔ Jigani (TBD) 12 km TBD 2032
TBD Old Airport Line MG Road ↔ Hope Farm (Underground) 16 km TBD 2032
TBD TBD Nagavara ↔ KIA (Elevated) 25 km TBD 2032

In popular culture[ಬದಲಾಯಿಸಿ]

Several films and commercials have been shot on the Namma Metro premises. The BMRCL charges ೫೦,೦೦೦ (ಯುಎಸ್$೧,೧೧೦) for shooting inside a metro station, and ೪೦,೦೦೦ (ಯುಎಸ್$೮೮೮) for shoots inside a metro train during peak hours between 6 am to 10 pm. During non-peak hours, from 10 pm to 4 am, the agency charges ೫೦,೦೦೦ (ಯುಎಸ್$೧,೧೧೦) for shoots inside metro stations and ೨೦,೦೦೦ (ಯುಎಸ್$೪೪೪) inside a train. The film producers must also make a security deposit of ಟೆಂಪ್ಲೇಟು:INRConvert/nolinks, as insurance for the metro property. Film shoots are permitted during three slots – 6 to 8 am, 12 pm to 2 pm, and 9 to 11 pm. Kannada films can avail lower rates.[೨೨೩]

The first film to shoot on Namma Metro was the Kannada blockbuster Ugramm in 2013. Later many other Kannada movies including 2015 film Rana Vikrama starring Puneeth Rajkumar and Adah Sharma, were shot using Namma Metro's facilities.[೨೨೪]

The 2012 Malayalam film 22 Female Kottayam, starring Fahadh Faasil and Rima Kallingal also has a song sequence shot in the Namma Metro coach.[ಸೂಕ್ತ ಉಲ್ಲೇಖನ ಬೇಕು]

In December 2016, Tamil film Imaikkaa Nodigal, starring Nayanthara became the first film to shoot scenes inside the tunnel stretch of the Purple Line. According to BMRC officials, prior to this film, one Kannada film, one Telugu film and several commercials had been shot on the Namma Metro premises.[೨೨೩]

In February 2017 a mobile game based on Namma Metro was released. It is called the Bangalore Metro Simulator 2017, which includes users to drive both Purple Line and Green Line. But the game is now not available in Google Play.[ಸೂಕ್ತ ಉಲ್ಲೇಖನ ಬೇಕು]

Controversies[ಬದಲಾಯಿಸಿ]

In August 2021, the Karnataka government requested large corporations with offices on the Outer Ring Road (ORR) to consider extending remote work policies until the end of 2022 to reduce traffic congestion during the soon-to-be initiated Metro rail construction on the stretch from Silk Board to KR Puram.[೨೨೫] Due to questions raised by IT companies and employees awaiting return to their offices, the government issued a clarification that it was not mandatory.[೨೨೬]

On 10 January 2023, an under-construction metro pillar casing on the ORR stretch of the Blue Line collapsed, leading to the death of a woman and her child. Several officials of the BMRCL and the Nagarjuna Construction Company (with whom the BMRCL had a contract with) have been booked. This has led to allegations of corruption and negligence of the civic bodies by the media.

Network Map[ಬದಲಾಯಿಸಿ]

Namma Metro map (As of Dec '21)

See also[ಬದಲಾಯಿಸಿ]

References[ಬದಲಾಯಿಸಿ]

  1. "Metro Phase I Will be Ready by May, to Miss Deadline". The New Indian Express. 22 ಅಕ್ಟೋಬರ್ 2015.
  2. ಉಲ್ಲೇಖ ದೋಷ: Invalid <ref> tag; no text was provided for refs named Annual Report
  3. "At 1 million passengers, Namma Metro records highest ridership on Friday - newindianexpress". The New Indian Express. Retrieved 1 ಸೆಪ್ಟೆಂಬರ್ 2019.
  4. "Passengers welcome higher Namma Metro frequency - KARNATAKA". The Hindu. 28 ಫೆಬ್ರವರಿ 2017. Retrieved 14 ಜನವರಿ 2018.
  5. "On slow track: Namma Metro operations grew just 5.6km/year over a decade".
  6. "India's second longest metro network is here".
  7. "Metro finally comes to Whitefield, take a ride on March 26 from 7 am!".
  8. ೮.೦ ೮.೧ "South India's first underground Metro launch on April 29". The Times of India. Retrieved 26 ಏಪ್ರಿಲ್ 2016.
  9. ೯.೦ ೯.೧ ೯.೨ "Namma Metro". english.bmrc.co.in. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  10. Correspondent, Special. "Namma Metro fares hiked, timings extended". The Hindu. Retrieved 20 ಜೂನ್ 2017.
  11. "All 420 trains now have 10 coaches commuters want better frequency".
  12. ೧೨.೦ ೧೨.೧ ೧೨.೨ ೧೨.೩ "WB Report on Transport" (PDF).
  13. "Namma metro to chug on October 20". IBN Live. 1 ಅಕ್ಟೋಬರ್ 2011. Archived from the original on 3 ಅಕ್ಟೋಬರ್ 2011. Retrieved 21 ಅಕ್ಟೋಬರ್ 2011.
  14. "Namma Metro inaugurated in Bangalore". Railway Gazette International. 24 ಅಕ್ಟೋಬರ್ 2011. Retrieved 5 ಜೂನ್ 2015.
  15. ೧೫.೦ ೧೫.೧ "Underground metro will be ready to take commuters in 15 days: K J George". The Times of India. 19 ಏಪ್ರಿಲ್ 2016. Retrieved 19 ಏಪ್ರಿಲ್ 2016.
  16. ೧೬.೦ ೧೬.೧ "Project Highlights". Official webpage of B.M.R.C. Archived from the original on 25 ಅಕ್ಟೋಬರ್ 2011. Retrieved 3 ಮೇ 2010.
  17. ೧೭.೦ ೧೭.೧ "Schematic Route Map". Bengaluru Metro Rail Corporation Limited. Archived from the original on 14 ಆಗಸ್ಟ್ 2015. Retrieved 5 ಜೂನ್ 2015.
  18. "Sampige Road-Peenya Metro Line Inaugurated". The New Indian Express. 1 ಮಾರ್ಚ್ 2014. Retrieved 5 ಜೂನ್ 2015.
  19. ೧೯.೦ ೧೯.೧ ೧೯.೨ ೧೯.೩ "25,000 ride Green line Metro on 1st working day". Deccan Herald. 3 ಮಾರ್ಚ್ 2014. Retrieved 5 ಜೂನ್ 2015.
  20. "Rajajinagar, Peenya residents can smile". The Times of India. 28 ನವೆಂಬರ್ 2011. Archived from the original on 15 ಜುಲೈ 2012.
  21. ೨೧.೦ ೨೧.೧ "Metro Reach 3B to be opened on May 1". Deccan Herald. 24 ಏಪ್ರಿಲ್ 2015. Retrieved 5 ಜೂನ್ 2015.
  22. ೨೨.೦ ೨೨.೧ "Reach 3B of Metro rail flagged off". The Hindu. 1 ಮೇ 2015. Retrieved 5 ಜೂನ್ 2015.
  23. ೨೩.೦ ೨೩.೧ "A closer look at Namma Metro that can transform Bengaluru's mobility landscape". The Economic Times. 9 ಜೂನ್ 2017. Retrieved 9 ಜೂನ್ 2017.
  24. "Bengaluru Metro Rarely Met Deadlines Expect no Surprise in April 2017". The Economic Times. 23 ಮಾರ್ಚ್ 2017. Retrieved 12 ಏಪ್ರಿಲ್ 2017.
  25. "Namma Metro: President Pranab Mukherjee inaugurates Bengaluru Namma Metro | India News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). 17 ಜೂನ್ 2017. Retrieved 3 ಸೆಪ್ಟೆಂಬರ್ 2020.
  26. Menezes, Naveen. "President Pranab Mukherjee inaugurates Rs 13,854 crore Namma Metro project". The Economic Times. Retrieved 3 ಸೆಪ್ಟೆಂಬರ್ 2020.
  27. Lalitha, S (14 ಜನವರಿ 2021). "First line of Bangalore Metro's Phase-2 flagged off". The New Indian Express. Retrieved 14 ಜನವರಿ 2021.
  28. ೨೮.೦ ೨೮.೧ "Namma Metro: Metro Network". Bangalore Metro Rail Corporation Limited. Archived from the original on 14 ಆಗಸ್ಟ್ 2015. Retrieved 5 ಜೂನ್ 2015.
  29. NewsKarnataka (19 ನವೆಂಬರ್ 2015). "Namma Metro takes its first ride on Mysuru Road". NewsKarnataka (in ಇಂಗ್ಲಿಷ್). Retrieved 12 ಸೆಪ್ಟೆಂಬರ್ 2020.
  30. ೩೦.೦ ೩೦.೧ "All of Bangalore Metro Phase-1 will be up and running from June 18". The New Indian Express. Retrieved 15 ಜೂನ್ 2017.
  31. Agarwal, Anshu (16 ಜನವರಿ 2021). "Namma Metro extends its service on Green Line". The Hindu. Retrieved 16 ಜನವರಿ 2021.
  32. "Kempegowda International Airport metro connectivity by Dec 2023: Bommai". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 29 ಡಿಸೆಂಬರ್ 2022. Retrieved 31 ಡಿಸೆಂಬರ್ 2022.
  33. "Long wait for Namma Metro's airport link corridor will end in 2023, CM Bommai promises". TimesNow (in ಇಂಗ್ಲಿಷ್). 29 ಡಿಸೆಂಬರ್ 2022. Retrieved 31 ಡಿಸೆಂಬರ್ 2022.
  34. "Karnataka approves plan to extend metro rail from Bommasandra to Hosur". The New Indian Express. Retrieved 10 ಜೂನ್ 2022.
  35. "Bengaluru: Namma Metro's first U-girder launched on ORR".
  36. "BMRCL launches U Girder for the first time on ORR-Airport metro line".
  37. "BMRCL to switch to U-girders for ORR, KIA Metro lines".
  38. "PM lays foundation stone for Bangalore Metro Rail Project". Zee News (in ಇಂಗ್ಲಿಷ್). 24 ಜೂನ್ 2006. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  39. "NEC loses 25% of Namma Metro contract". The New Indian Express. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  40. "Bangalore Metro seeks Rs 1,763 cr for extension work". The Financial Express (in ಅಮೆರಿಕನ್ ಇಂಗ್ಲಿಷ್). 17 ಜುಲೈ 2008. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  41. ೪೧.೦ ೪೧.೧ Shah, Narendra (20 ಆಗಸ್ಟ್ 2015). "Bangalore Metro|BMRC Ex-Chiefs unite against Sreedharan's view". Metro Rail News (in ಅಮೆರಿಕನ್ ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  42. "A majestic prospect – tunnelling the Bangalore metro". Railway Technology (in ಬ್ರಿಟಿಷ್ ಇಂಗ್ಲಿಷ್). 17 ಆಗಸ್ಟ್ 2011. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  43. "Bangalore Metro TBMs inaugurated". tunneltalk.com. Retrieved 8 ಸೆಪ್ಟೆಂಬರ್ 2020.
  44. "Helen, Margarita to resume Metro tunneling work soon". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 1 ಮೇ 2012. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  45. N, Shree D. (11 ಮಾರ್ಚ್ 2016). "When is Namma Metro Phase-I expected to complete realistically?". Citizen Matters, Bengaluru (in ಬ್ರಿಟಿಷ್ ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  46. "Tunnelling for Bengaluru Metro tougher than anywhere in the world, says official". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 5 ಮೇ 2016. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  47. Aparajita Ray (21 ಏಪ್ರಿಲ್ 2015). "Metro's tunnel borer to get its teeth again | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  48. "What you need to know about Bengaluru's new metro line". thenewsminute.com. 14 ಜೂನ್ 2017. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  49. "Bangalore Metro misses deadline for 4th time, minister sets Sept 26 as next date : South, News". India Today. 16 ಸೆಪ್ಟೆಂಬರ್ 2011. Retrieved 8 ಸೆಪ್ಟೆಂಬರ್ 2014.
  50. "Bangalore Metro | Namma Metro". Karnataka.com (in ಅಮೆರಿಕನ್ ಇಂಗ್ಲಿಷ್). 20 ಅಕ್ಟೋಬರ್ 2011. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  51. "Metro comes to Bangalore finally". The Times of India. 20 ಅಕ್ಟೋಬರ್ 2011. Archived from the original on 20 ಅಕ್ಟೋಬರ್ 2011.
  52. "Revenue Services Report" (PDF). Archived from the original (PDF) on 24 ಜೂನ್ 2013.
  53. Madhumathi D.S. "Business Line : Industry & Economy / Logistics : Namma Metro rides on 'gawk' power". Business Line. Retrieved 3 ಜನವರಿ 2012.
  54. Special Correspondent (28 ಫೆಬ್ರವರಿ 2014). "CM in a hurry, delays Namma Metro launch". The Hindu. Retrieved 27 ಮಾರ್ಚ್ 2014.
  55. "Byappanahallimg road metro stretch more popular". The Hindu.
  56. ೫೬.೦ ೫೬.೧ "At 4.58 lakh passengers, Namma Metro records highest ridership on Friday". The New Indian Express. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  57. ೫೭.೦ ೫೭.೧ ೫೭.೨ ೫೭.೩ "Bangalore Metro Rail Project Phase 2" (PDF). bmrc.co.in. BMRC. Archived from the original (PDF) on 12 ಏಪ್ರಿಲ್ 2015. Retrieved 5 ಜೂನ್ 2015.
  58. Kushala SKushala S. (21 ಮಾರ್ಚ್ 2015). "Metro Phase-I cost is now Rs 13,845 crore". Bangalore Mirror (in ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  59. "Godavari sees light". Bangalore Mirror (in ಇಂಗ್ಲಿಷ್). 20 ಏಪ್ರಿಲ್ 2016. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  60. "Getting Bangalore Metro north-south line back on track". tunneltalk.com. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  61. Menezes, Naveen. "Cost and & time overrun marks Bengaluru metro phase-I". The Economic Times. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  62. "State Cabinet approves phase-II of metro". Business Standard. 4 ಜನವರಿ 2012. Retrieved 6 ಮಾರ್ಚ್ 2012.
  63. "Metro project: Cabinet approves two new lines for Phase 2". The Times of India. 4 ಜನವರಿ 2012. Archived from the original on 28 ಸೆಪ್ಟೆಂಬರ್ 2013.
  64. "Cabinet clears Namma Metro Phase 2 – Bangalore – DNA". Daily News and Analysis. 4 ಜನವರಿ 2012. Retrieved 6 ಮಾರ್ಚ್ 2012.
  65. IRJ (30 ಜನವರಿ 2014). "Go-ahead for Bangalore metro phase 2".
  66. "Cities / Bangalore : Frame policy for differential fare pricing, BMRCL told". The Hindu. Chennai, India. 22 ಫೆಬ್ರವರಿ 2012. Retrieved 6 ಮಾರ್ಚ್ 2012.
  67. "Underground Bengaluru Metro Station service flagged off, Siddaramaiah seeks Centre's help for Namma Metro phase III | Latest News & Updates at Daily News & Analysis". dna. 29 ಏಪ್ರಿಲ್ 2016. Retrieved 29 ಏಪ್ರಿಲ್ 2016.
  68. "Namma Metro Phase 2 will now cost Rs 32,000 crore: Deputy Chief Minister G Parameshwara". The New Indian Express. Retrieved 24 ಜನವರಿ 2019.
  69. "Metro gets poll push for Phase II". Deccan Chronicle. 4 ಜೂನ್ 2013. Retrieved 28 ಸೆಪ್ಟೆಂಬರ್ 2013.
  70. "All new Namma Metro stations in Phase II may get bus bays | Bengaluru News - Times of India". The Times of India.
  71. "Metro Phase 2 will be bigger, better, says BMRCL chief". Deccan Herald. 23 ಡಿಸೆಂಬರ್ 2016. Retrieved 13 ಜನವರಿ 2017.
  72. Menezes, Naveen. "Bengaluru Metro phase 2 land acquisition on track – The Economic Times". The Economic Times. Retrieved 13 ಏಪ್ರಿಲ್ 2017.
  73. "IL&FS Engg bags Bangalore Metro contract worth Rs 327 cr". Business Standard India. 24 ಏಪ್ರಿಲ್ 2015. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  74. "NCC ltd emerges lowest bidder for bangalore metros 6.9km extension to Anjanapura" (in ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020 – via Twitter.
  75. "BMRCL invites bids for 3-km extension from Nagasandra". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 13 ಅಕ್ಟೋಬರ್ 2016. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  76. ೭೬.೦ ೭೬.೧ "ITD-Cemindia JV emerges L1 bidder for four packages of Bangalore Metro". projectstoday.com. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  77. "HCC-URCC JV bags Bangalore Metro contract worth Rs 789 crore". indiainfoline.com (in ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  78. Menezes, Naveen. "Simplex Infrastructures quotes lowest to build metro stretch on Bannerghatta Road". The Economic Times. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  79. "Bangalore Metro bids for Phase II". tunneltalk.com. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  80. Menezes, Naveen. "High cost forces BMRCL to cancel underground tenders". The Economic Times. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  81. Menezes, Naveen. "Vellara Junction-Pottery Town metro underground work to start in 6 months". The Economic Times. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  82. "Bangalore Metro Phase II moves ahead". tunneltalk.com. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  83. Shah, Narendra (26 ಸೆಪ್ಟೆಂಬರ್ 2019). "ITD Cementation bags Rs. 1549 cr contract from BMRCL". Metro Rail News (in ಅಮೆರಿಕನ್ ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  84. Sarim. "BMRCL awarding 14-km metro contracts to ITD & Afcons". nbmcw.com (in ಬ್ರಿಟಿಷ್ ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  85. Sarim. "L&T launches tunneling works for Bangalore metro". nbmcw.com (in ಬ್ರಿಟಿಷ್ ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  86. "Bengaluru: Metro underground tunnel work on Cantonment, Tannery Road stations begins". daijiworld.com. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  87. "Metro line from Silk Board to KR Puram to be fast-tracked". The Times of India. Retrieved 18 ಸೆಪ್ಟೆಂಬರ್ 2016.
  88. "Metro link to Outer Ring Road: BMRC unveils DPR, invites suggestions". The Times of India. Retrieved 17 ಫೆಬ್ರವರಿ 2017.
  89. Correspondent, Special. "Karnataka Cabinet approves ORR metro line". The Hindu. Retrieved 2 ಮಾರ್ಚ್ 2017.
  90. Christin Mathew Philip (17 ಡಿಸೆಂಬರ್ 2018). "Bangalore: Setback for techies as BMRCL cancels ORR project tender | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  91. "Namma Metro ORR line tender receives 14 bids". The New Indian Express. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  92. Singh, Neha (20 ಮಾರ್ಚ್ 2020). "Namma Metro Outer Ring Road line tender receives 14 bids". Metro Rail News (in ಅಮೆರಿಕನ್ ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  93. Ramesh, B. S. (6 ಅಕ್ಟೋಬರ್ 2010). "SPV for high-speed rail link". The Hindu (in Indian English). ISSN 0971-751X. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  94. "DPR for Metro link to BIA in five months". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 3 ನವೆಂಬರ್ 2012. Retrieved 8 ಅಕ್ಟೋಬರ್ 2020.
  95. "Bangalore Metro Rail yet to decide on route for Airport Line".
  96. "Now, suggest a Namma Metro route to the airport". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 15 ಸೆಪ್ಟೆಂಬರ್ 2016. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  97. "Central funding brightens prospects of metro line to Bengaluru airport". The Hindu (in Indian English). Special Correspondent. 14 ಜನವರಿ 2017. ISSN 0971-751X. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.{{cite news}}: CS1 maint: others (link)
  98. Suchith Kidiyoor (7 ಡಿಸೆಂಬರ್ 2016). "Bengaluru wants KIA Metro line via Nagawara". Bangalore Mirror (in ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  99. "Bengaluru Metro airport line to now run through Hebbal". The New Indian Express. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  100. "Govt finalises KIA metro link route". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 13 ಮೇ 2017. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  101. "Airport Metro line gets one station but loses another". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 25 ಜುಲೈ 2019. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  102. "Karnataka government clears suburban rail project, Metro to airport | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). TNN. 11 ಜನವರಿ 2019. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  103. "Huge relief in sight for techies, flyers as Centre clears ORR-Airport Line for Bengaluru". The New Indian Express. Retrieved 21 ಏಪ್ರಿಲ್ 2021.
  104. Christin Mathew Philip (22 ಸೆಪ್ಟೆಂಬರ್ 2021). "Complete Bengaluru Metro Phase 2 by 2024: Karnataka CM Basavaraj Bommai | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). Retrieved 24 ಸೆಪ್ಟೆಂಬರ್ 2021.
  105. "Metro pillar crash: Sudden loss leaves Bengaluru family shattered".
  106. "'I wish I had died too': Husband recalls Bengaluru metro accident horror".
  107. "Bengaluru metro structure falls; techie, kid killed".
  108. "What caused the under-construction metro pier in Bengaluru to fall?".
  109. "Metro structure falls on family of 4, kills mother & toddler-son in Bengaluru".
  110. "I regret not insisting on her to work from home, says mother-in-law of Bengaluru Metro pillar collapse victim".
  111. "'I will pay you Rs 1 crore. Can you bring back my daughter and grandson?': Bengaluru Metro pillar collapse victim's father".
  112. "Bengaluru News Highlights: Woman, her son die after under-construction metro pillar collapses in Hennur CM Bommai announces Rs 10 lakh compensation each".
  113. "How COVID-19 will impact already delayed metro projects in Bengaluru". thenewsminute.com. 4 ಆಗಸ್ಟ್ 2020. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  114. ಡೆಡ್'ಲೈನ್'ಗೂ ಮುನ್ನವೇ ಕಾಮಗಾರಿ ಕಂಪ್ಲೀಟ್: ನಮ್ಮ ಮೆಟ್ರೋಗೆ ಹೊಸ ವೇಗ ನೀಡಿದ U-ಗರ್ಡರ್ | Namma metro (in ಇಂಗ್ಲಿಷ್), retrieved 11 ಆಗಸ್ಟ್ 2022
  115. "Bengaluru: All Purple Line trains to run up to Kengeri only during peak hours | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). TNN. 22 ಆಗಸ್ಟ್ 2021. Retrieved 22 ಆಗಸ್ಟ್ 2021.
  116. "Bengaluru Metro blames rain for delay of Baiyappanahalli-Whitefield trial run". The Indian Express (in ಇಂಗ್ಲಿಷ್). 21 ಸೆಪ್ಟೆಂಬರ್ 2022. Retrieved 24 ಸೆಪ್ಟೆಂಬರ್ 2022.
  117. ೧೧೭.೦ ೧೧೭.೧ Menezes, Naveen. "Cost and & time overrun marks Bengaluru metro phase-I – The Economic Times". The Economic Times. Retrieved 9 ಮಾರ್ಚ್ 2017.
  118. ೧೧೮.೦ ೧೧೮.೧ ೧೧೮.೨ "Metro June Deadline Stands, But With Rider". The New Indian Express. Retrieved 27 ಏಪ್ರಿಲ್ 2016.
  119. "B'lore Metro to raise Rs 300 cr via bond issue". Business Standard. 11 ಜೂನ್ 2013. Retrieved 28 ಸೆಪ್ಟೆಂಬರ್ 2013.
  120. "BMRC proves merit in investment ratings". The Times of India. Archived from the original on 30 ಸೆಪ್ಟೆಂಬರ್ 2013.
  121. "BMRCL defers issue of bonds citing market volatility". The Hindu. Chennai, India. 4 ಆಗಸ್ಟ್ 2013.
  122. "Admin approval for Namma Metro Phase 2 – South India – Karnataka – ibnlive". Ibnlive.in.com. Archived from the original on 10 ಜುಲೈ 2012. Retrieved 6 ಮಾರ್ಚ್ 2012.
  123. ೧೨೩.೦ ೧೨೩.೧ ೧೨೩.೨ Lalitha, S. (6 ಫೆಬ್ರವರಿ 2017). "European Bank's Rs 3.7k crore fillip for Metro Phase-II". The New Indian Express. Retrieved 10 ಫೆಬ್ರವರಿ 2017.
  124. Bangalore, DHNS (17 ಅಕ್ಟೋಬರ್ 2012). "Centre's nod awaited to extend Metro to Bengaluru Intl Airport". Deccan Herald. Retrieved 4 ಮಾರ್ಚ್ 2013.
  125. "Bangalore Metro gets $250 mn ADB loan". Business Standard. 28 ಮಾರ್ಚ್ 2012. Retrieved 25 ಜುಲೈ 2012.
  126. "Funding for Phase II". The Hindu. 12 ಜನವರಿ 2017. Retrieved 13 ಜನವರಿ 2017.
  127. "Rs 3,700-cr loan likely for Nagawara-Gottigere line". Deccan Herald. 9 ಮೇ 2017. Retrieved 11 ಮೇ 2017.
  128. Briginshaw, David (28 ಫೆಬ್ರವರಿ 2017). "India seeks EIB loan for Bangalore metro Line 4". International Rail Journal. Retrieved 2 ಮಾರ್ಚ್ 2017.
  129. "Biocon, Infy to Adopt Two Metro Stations – ETtech". The Economic Times. Retrieved 18 ಮೇ 2017.
  130. "Namma Metro: BMRCL Inks $500 Million Funding Deal With ADB For Under Construction ORR Metro, Achieves Financial Closure For Rs.14,844 Cr Project". in.news.yahoo.com (in Indian English). Retrieved 20 ಆಗಸ್ಟ್ 2021.
  131. "13.25 lakh rode the Metro". The Times of India. 25 ನವೆಂಬರ್ 2011. Archived from the original on 15 ಜುಲೈ 2012.
  132. "Namma Metro gains momentum – southindia – Bangalore – ibnlive". Ibnlive.in.com. Archived from the original on 23 ನವೆಂಬರ್ 2011. Retrieved 3 ಜನವರಿ 2012.
  133. "Joyrides in Bangalore Metro are over – Bangalore – DNA". Daily News and Analysis. Retrieved 25 ಜುಲೈ 2012.
  134. ೧೩೪.೦ ೧೩೪.೧ "Bangalore Metro posts Rs 41 lakh profit in first year – Bangalore – DNA". Daily News and Analysis. 18 ಅಕ್ಟೋಬರ್ 2012. Retrieved 18 ಅಕ್ಟೋಬರ್ 2012.
  135. "Behind BMRCL's non-fare revenue goals".
  136. Staff Reporter (20 ಅಕ್ಟೋಬರ್ 2016). "Metro to complete 5 years of operations". The Hindu. Retrieved 2 ನವೆಂಬರ್ 2016.
  137. ೧೩೭.೦ ೧೩೭.೧ "Bangalore Metro Route Map 2020: Station List, Fare, Timings". indiametrorail.com (in ಇಂಗ್ಲಿಷ್). Retrieved 30 ಮೇ 2020.
  138. "Railway Gazette: Bangalore metro trial". Retrieved 13 ಫೆಬ್ರವರಿ 2011.
  139. Bengaluru, DHNS (4 ಫೆಬ್ರವರಿ 2017). "Metro Phase 1 set to meet April deadline". Deccan Herald. Retrieved 11 ಫೆಬ್ರವರಿ 2017.
  140. "BEML wins Rs 1,421-cr contract from Bangalore Metro". Business Line. 27 ಮಾರ್ಚ್ 2017. Retrieved 28 ಮಾರ್ಚ್ 2017.
  141. "Second six-coach Namma Metro train flagged off - Times of India". The Times of India. Retrieved 24 ಜನವರಿ 2019.
  142. Christin Mathew Philip (29 ಜನವರಿ 2020). "All 42 metro trains now have 6 coaches, says BMRCL; passengers want better frequency | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). Retrieved 6 ಸೆಪ್ಟೆಂಬರ್ 2020.
  143. "Bangalore Metro goes wi-fi". Deccan Chronicle. 1 ಆಗಸ್ಟ್ 2013. Retrieved 28 ಸೆಪ್ಟೆಂಬರ್ 2013.
  144. ೧೪೪.೦ ೧೪೪.೧ "NAMMA-METRO-IS-A-GEEK-TRAIN". The Times of India. 16 ಅಕ್ಟೋಬರ್ 2011. Retrieved 21 ಅಕ್ಟೋಬರ್ 2011.
  145. "ABB wins $115 million order to power Bangalore metro". The ABB Group. Retrieved 1 ಜನವರಿ 2010.
  146. ೧೪೬.೦ ೧೪೬.೧ ೧೪೬.೨ ೧೪೬.೩ ೧೪೬.೪ ೧೪೬.೫ "BMRC hoping to finish work on Sampige Road-Puttenahalli line ahead of April 2017 deadline". The Times of India. Retrieved 5 ನವೆಂಬರ್ 2016.
  147. Songer, Dave. "Alstom signs £62-million deal with Bangalore Metro for electrification of Phase II". smartrailworld.com. Retrieved 26 ಏಪ್ರಿಲ್ 2019.
  148. "Alstom will provide train control and signalling system for the new Bangalore metro network in India". Alstom. Retrieved 2 ಅಕ್ಟೋಬರ್ 2011.[ಮಡಿದ ಕೊಂಡಿ]
  149. "Alstom-led consortium in pact with Bangalore Metro". Business Standard. 18 ಸೆಪ್ಟೆಂಬರ್ 2009. Retrieved 3 ಮೇ 2010.
  150. "2,240 workers worked day in, day out to build India's largest metro station". Bangalore Mirror. Retrieved 27 ಏಪ್ರಿಲ್ 2016.
  151. "At Metro, wanna pee? Pay Rs 3 – Bangalore – DNA". Daily News and Analysis. Retrieved 28 ಸೆಪ್ಟೆಂಬರ್ 2013.
  152. Staff Reporter (21 ಫೆಬ್ರವರಿ 2017). "Metro stations to get more ATMs". The Hindu. Retrieved 21 ಫೆಬ್ರವರಿ 2017.
  153. "Why Namma Metro stations under Phase 2 will be smaller than Bengaluru Metro Phase 1". The Financial Express. 16 ಏಪ್ರಿಲ್ 2019. Retrieved 4 ಮೇ 2019.
  154. "Bengaluru Metro Phase-II: Underground stations will be smaller". The New Indian Express. Retrieved 4 ಮೇ 2019.
  155. "Bengaluru: Cab aggregator booking kiosks at Metro stations soon". Deccan Chronicle. 23 ಫೆಬ್ರವರಿ 2017. Retrieved 23 ಫೆಬ್ರವರಿ 2017.
  156. KJ, Shashidhar (23 ಫೆಬ್ರವರಿ 2017). "Ola will set up kiosks for cab booking at Bangalore metro stations". MediaNama. Retrieved 23 ಫೆಬ್ರವರಿ 2017.
  157. ೧೫೭.೦ ೧೫೭.೧ "DPR Silkboard-KRPuram-Airport Line" (PDF).
  158. Sastry, Anil Kumar (2 ಮೇ 2012). "Behind the scenes of Namma Metro". The Hindu (in Indian English). ISSN 0971-751X. Retrieved 7 ಸೆಪ್ಟೆಂಬರ್ 2020.
  159. "Bangalore Metro Rail Training Institute goes global; companies based in US & UK nominate staff for training – RailNews Media India Ltd" (in ಅಮೆರಿಕನ್ ಇಂಗ್ಲಿಷ್). Retrieved 7 ಸೆಪ್ಟೆಂಬರ್ 2020.
  160. Menezes, Naveen. "Namma Metro looks to bolster revenue, may exploit space in phase II depots for commercial use". The Economic Times. Retrieved 7 ಸೆಪ್ಟೆಂಬರ್ 2020.
  161. Senthalir S. (22 ಅಕ್ಟೋಬರ್ 2010). "BMRC spent '533 crore only to acquire land | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). Retrieved 7 ಸೆಪ್ಟೆಂಬರ್ 2020.
  162. ೧೬೨.೦ ೧೬೨.೧ ೧೬೨.೨ Christin Mathew Philip (18 ಮಾರ್ಚ್ 2019). "Namma Metro News: Decks cleared for Namma Metro's Phase 2 depots | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). Retrieved 7 ಸೆಪ್ಟೆಂಬರ್ 2020.
  163. "Ground-level elevated metro depot at Bengaluru's Challaghatta to save Rs 400 crore". The New Indian Express. Retrieved 16 ಡಿಸೆಂಬರ್ 2021.
  164. Naveen Menezes (23 ಮೇ 2020). "Noida-based firm is lowest bidder for Kothanur depot". Bangalore Mirror (in ಇಂಗ್ಲಿಷ್). Retrieved 7 ಸೆಪ್ಟೆಂಬರ್ 2020.
  165. "BMRCL likely to get Kadugodi forest land in a month". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 2 ಆಗಸ್ಟ್ 2019. Retrieved 7 ಸೆಪ್ಟೆಂಬರ್ 2020.
  166. "Tenders called for three packages for Metro's Airport Line". The New Indian Express. Retrieved 7 ಸೆಪ್ಟೆಂಬರ್ 2020.
  167. "Bengaluru's Airport Metro dream on track, Shettigere to house depot". www.timesnownews.com (in ಇಂಗ್ಲಿಷ್). Retrieved 20 ಆಗಸ್ಟ್ 2021.
  168. "Metro pillars a vertical garden – Bangalore Mirror -". Bangalore Mirror. Retrieved 10 ಮಾರ್ಚ್ 2017.
  169. Special Correspondent (24 ಫೆಬ್ರವರಿ 2014). "BMRCL launches road-cum-rail vehicle for rescue operations". The Hindu. Retrieved 29 ಆಗಸ್ಟ್ 2015.
  170. "'We've taken steps to ensure public safety'". The Times of India. 28 ಅಕ್ಟೋಬರ್ 2011.
  171. G. Ananthakrishnan (14 ಜನವರಿ 2013). "Linking modes of commute". The Hindu. Chennai, India. Retrieved 4 ಮಾರ್ಚ್ 2013.
  172. "Sidewalks under Metro corridors to get a facelift". The Times of India. Retrieved 10 ಫೆಬ್ರವರಿ 2017.
  173. "Footpaths along 40-km Metro corridors to get facelift". Deccan Herald. 9 ಫೆಬ್ರವರಿ 2017. Retrieved 10 ಫೆಬ್ರವರಿ 2017.
  174. "'Liquid' cash from viaduct". The Hindu. Chennai, India. 15 ಡಿಸೆಂಬರ್ 2011.
  175. "Metro will extend rainwater harvesting project to Phase 2". Deccan Herald. 22 ಮಾರ್ಚ್ 2017. Retrieved 24 ಮಾರ್ಚ್ 2017.
  176. ೧೭೬.೦ ೧೭೬.೧ Francis, Merlin (2 ಏಪ್ರಿಲ್ 2012). "Namma Metro gets waterwise". DNA India. Bangalore, India. Retrieved 24 ಜೂನ್ 2012.
  177. "Metro medians turn garbage dumps". The Times of India. 6 ಆಗಸ್ಟ್ 2012. Archived from the original on 26 ಜನವರಿ 2013.
  178. "Lakes to come alive along Metro path". The Times of India. 4 ನವೆಂಬರ್ 2012. Archived from the original on 3 ಜನವರಿ 2013. Retrieved 4 ಮಾರ್ಚ್ 2013.
  179. "BMRCL plans to rejuvenate lakes, starting with Kengeri – Bangalore – DNA". Daily News and Analysis. 4 ನವೆಂಬರ್ 2012. Retrieved 4 ಮಾರ್ಚ್ 2013.
  180. "Bengaluru Metro System Adopts NXP's MIFARE Technology". MarketWatch. 23 ಜನವರಿ 2012. Archived from the original on 25 ಜನವರಿ 2012. Retrieved 13 ಜನವರಿ 2017.
  181. "Bangalore Metro: Recharge and ride on". The Times of India. 1 ಜನವರಿ 1970. Retrieved 21 ಅಕ್ಟೋಬರ್ 2011.
  182. "Cities / Bangalore : 20,000 smart cards sold for metro ride". The Hindu. Chennai, India. 17 ಅಕ್ಟೋಬರ್ 2011. Retrieved 21 ಅಕ್ಟೋಬರ್ 2011.
  183. "Namma Metro". english.bmrc.co.in. Retrieved 17 ಡಿಸೆಂಬರ್ 2018.
  184. "20,000 smart cards sold for metro ride". The Hindu. 17 ಅಕ್ಟೋಬರ್ 2011. Retrieved 8 ಸೆಪ್ಟೆಂಬರ್ 2014.
  185. ReporterBengaluru, Staff (28 ಫೆಬ್ರವರಿ 2017). "Namma Metro withdraws Sanchar tickets". The Hindu. Retrieved 2 ಮಾರ್ಚ್ 2017.
  186. "BMRC withdraws cheaper trip tickets, commuters fume". The Times of India. Retrieved 2 ಮಾರ್ಚ್ 2017.
  187. Bangalore, DHNS (3 ಡಿಸೆಂಬರ್ 2012). "Automatic ticket vending at Metro stations". Deccan Herald. Retrieved 4 ಮಾರ್ಚ್ 2013.
  188. "Yeshwantpur Metro link work picks up pace". The Times of India. 5 ಡಿಸೆಂಬರ್ 2012. Archived from the original on 26 ಜನವರಿ 2013. Retrieved 4 ಮಾರ್ಚ್ 2013.
  189. "BMRCL launches online system to top up Metro cards". Deccan Herald. 17 ನವೆಂಬರ್ 2016. Retrieved 18 ನವೆಂಬರ್ 2016.
  190. "Namma metro may up frequency". The New Indian Express. Retrieved 6 ಜೂನ್ 2016.
  191. "Metro Phase 1 set to meet April deadline". Deccan Herald. 4 ಫೆಬ್ರವರಿ 2017. Retrieved 10 ಫೆಬ್ರವರಿ 2017.
  192. "Metro speed upped on Purple line". Deccan Herald. 24 ಡಿಸೆಂಬರ್ 2016. Retrieved 13 ಜನವರಿ 2017.
  193. Bangalore, DHNS (22 ಡಿಸೆಂಬರ್ 2012). "Bar timings relaxed for revellers". Deccan Herald. Retrieved 6 ಜೂನ್ 2013.
  194. "Metro to run till midnight today, tomorrow". The Times of India. 24 ಡಿಸೆಂಬರ್ 2012. Archived from the original on 26 ಜನವರಿ 2013. Retrieved 6 ಜೂನ್ 2013.
  195. Service, Indo-Asian News (2 ಮೇ 2016). "Record one lakh commuters travel in Bengaluru metro on Sunday". India News, Breaking News | India.com (in ಇಂಗ್ಲಿಷ್). Retrieved 23 ಆಗಸ್ಟ್ 2021.
  196. "17 crore passengers have boarded Bengaluru Metro since 2011". The New Indian Express. Retrieved 23 ಆಗಸ್ಟ್ 2021.
  197. "Bengaluru Metro to restart tomorrow. Here's all you need to know". Hindustan Times (in ಇಂಗ್ಲಿಷ್). 6 ಸೆಪ್ಟೆಂಬರ್ 2020. Retrieved 23 ಆಗಸ್ಟ್ 2021.
  198. "Bengaluru: Covid-hit Metro operator plans to raise Rs 500 crore | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). TNN. 25 ಜೂನ್ 2021. Retrieved 23 ಆಗಸ್ಟ್ 2021.
  199. Chethan Kumar, Bangalore, DHNS (22 ಮೇ 2013). "RDSO in no hurry to allow Metro to up speed". Deccan Herald. Retrieved 6 ಜೂನ್ 2013.{{cite web}}: CS1 maint: multiple names: authors list (link)
  200. "Namma Metro security cover to soon get a boost". The New Indian Express. Retrieved 18 ಮಾರ್ಚ್ 2017.
  201. "Mock drill at Metro stations takes passengers aback". Deccan Herald. 26 ಮಾರ್ಚ್ 2017. Retrieved 26 ಮಾರ್ಚ್ 2017.
  202. "Metro gets luggage scanners". Deccan Herald. 2 ಡಿಸೆಂಬರ್ 2011.
  203. Rohith B R, Bangalore, DHNS (18 ಅಕ್ಟೋಬರ್ 2012). "Commuters' brush with etiquette on Namma Metro". Deccan Herald. Retrieved 6 ಜೂನ್ 2013.{{cite web}}: CS1 maint: multiple names: authors list (link)
  204. "No entry for drunk commuters in Metro". Deccan Chronicle. 25 ಡಿಸೆಂಬರ್ 2012. Retrieved 6 ಜೂನ್ 2013.
  205. "Not fine to spit in Metro". The Times of India. 11 ಅಕ್ಟೋಬರ್ 2012. Archived from the original on 3 ಜನವರಿ 2013. Retrieved 6 ಜೂನ್ 2013.
  206. "New app for Namma Metro once Phase 1 gets fully operational". Deccan Herald. 4 ಜೂನ್ 2015. Retrieved 29 ಆಗಸ್ಟ್ 2015.
  207. Bengaluru: DHNS (5 ನವೆಂಬರ್ 2016). "Metro trial run between National College, Puttenahalli in 3 weeks". Deccan Herald. Retrieved 11 ಫೆಬ್ರವರಿ 2017.
  208. "'Unofficial' apps of govt transport corpns flood digital platform". Deccan Herald. Retrieved 2 ನವೆಂಬರ್ 2016.
  209. "Namma Metro, a third phase in the making". Deccan Herald (in ಇಂಗ್ಲಿಷ್). 22 ಮೇ 2016. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  210. Menezes, Naveen. "Bangalore Metro: Namma Metro phase III may make way for elevated corridor". The Economic Times. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  211. "Bengaluru Comprehensive Mobility Plan a 'backdoor' to elevated corridor?". thenewsminute.com. 18 ಜನವರಿ 2020. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  212. Naveen Menezes (20 ಜನವರಿ 2020). "Citizens want Metro to stay off CMP, mind its own business". Bangalore Mirror (in ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  213. "Bengaluru's Draft Mobility Plan in a nutshell: Elevated corridors get Rs 18,480 crore". Citizen Matters, Bengaluru (in ಬ್ರಿಟಿಷ್ ಇಂಗ್ಲಿಷ್). 18 ಡಿಸೆಂಬರ್ 2019. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  214. "One-man show? BMRCL prepares 'comprehensive' mobility plan alone". Bangalore Mirror (in ಇಂಗ್ಲಿಷ್). 6 ಜನವರಿ 2020. Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  215. Christin Mathew Philip (20 ನವೆಂಬರ್ 2019). "Bengaluru: Gottigere-Nagawara Metro line to go Pink | Bengaluru News - Times of India". The Times of India (in ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  216. Singh, Neha (7 ಮಾರ್ಚ್ 2020). "BMRCL to Construct two Metrolite corridors via PPP mode". Metro Rail News (in ಅಮೆರಿಕನ್ ಇಂಗ್ಲಿಷ್). Retrieved 2 ಸೆಪ್ಟೆಂಬರ್ 2020.
  217. ೨೧೭.೦ ೨೧೭.೧ ೨೧೭.೨ "42 KMs Bangalore Metro Phase-3 Project will start its operation by 2027-28". Metro Rail News. 27 ಅಕ್ಟೋಬರ್ 2021.
  218. "BMRCL resumes traffic analysis to finalise Phase 3 lines". Deccan Herald. 24 ನವೆಂಬರ್ 2021.
  219. ೨೧೯.೦ ೨೧೯.೧ "Sarjapur-Hebbal Metro line to touch core Bengaluru areas". Swarajya Marg. 4 ಮಾರ್ಚ್ 2022.
  220. Staff Reporter (25 ನವೆಂಬರ್ 2022). "Namma Metro gets Karnataka Government approval for Phase 3 corridor". Metro Rail News (in ಅಮೆರಿಕನ್ ಇಂಗ್ಲಿಷ್). Retrieved 28 ನವೆಂಬರ್ 2022.
  221. "Bengaluru: Hebbal to get three Metro stations in 500m radius". Times of India. 12 ಮಾರ್ಚ್ 2022.
  222. "Karnataka govt action plan moots four new metro lines". Deccan Herald. 10 ಮಾರ್ಚ್ 2023.
  223. ೨೨೩.೦ ೨೨೩.೧ "Shooting in the metro tunnel". Bangalore Mirror. Retrieved 11 ಡಿಸೆಂಬರ್ 2016.
  224. "Puneeth Rajkumar, Adah Sharma shoot at MG Road Metro Station, Bangalore - Times of India". The Times of India.
  225. Poovanna, Sharan (24 ಆಗಸ್ಟ್ 2021). "Allow WFH till Dec 2022 to help Bengaluru Metro work: K'taka govt to IT firms". www.hindustantimes.com. Hindustan Times. Retrieved 5 ಸೆಪ್ಟೆಂಬರ್ 2021. Allow WFH till Dec 2022 to help Bengaluru Metro work: K'taka govt to IT firms
  226. "Karnataka govt retracts WFH advisory for IT companies along Bengaluru Outer Ring Road after backlash". www.firstpost.com. FP Trending. 2 ಸೆಪ್ಟೆಂಬರ್ 2021. Retrieved 5 ಸೆಪ್ಟೆಂಬರ್ 2021. The government clarified its stand later. Reddy issued a new notification saying that the advisory was not mandatory and should not be treated as such.

External links[ಬದಲಾಯಿಸಿ]

ವಿಕಿಟ್ರಾವೆಲ್ ನಲ್ಲಿ Demopan444/sandbox ಪ್ರವಾಸ ಕೈಪಿಡಿ (ಆಂಗ್ಲ) ಟೆಂಪ್ಲೇಟು:Rapid transit OSM map

ಟೆಂಪ್ಲೇಟು:Namma Metro

ಟೆಂಪ್ಲೇಟು:International Metro Organizations